Nội dung text FF METHOD STATEMENT.pdf
Trang 2/56 MUC LUC / TABLE OF CONTENTS 1. GIỚI THIỆU CHUNG / GENERAL INFORMATION.....................................................4 1.1. Mục đích / Purpose ........................................................................................................................4 1.2. Phạm vi áp dụng / Scope of Application....................................................................................... 4 1.3. Thuật ngữ và định nghĩa / Terminology and definitions...............................................................4 2. NỘI DUNG / CONTENTS.................................................................................................... 4 2.1. Biên pháp thi công hê thông báo cháy / Method for fire alarm system construction....................4 2.1.1. Công tac chuân bi / Preparation...........................................................................................4 2.1.2. Quy đinh chung / General regulations.................................................................................. 6 2.1.3. Lăp đăt ông dươi dan trươc khi thi công măt san / Installation of pipes under the floor before floor construction....................................................................................................................... 9 2.1.4. Thi công lăp đăt ông nhưa trong tương bê tông đa đuc / Construction and installation of plastic pipes in the cast concrete walls............................................................................................... 11 2.1.5. Lăp ông nhưa nôi trên tương va trân bê tông đa đuc / Installation of plastic tube floating on the wall and cast concrete ceiling.................................................................................................. 13 2.1.6. Thi công lăp đăt đương ông nhưa xuyên tương bê tông / Installation of plastic pipe through concrete walls........................................................................................................................ 15 2.1.7. Công tac thi công lăp đăt mang cap va nôi ông chơ vao mang / Construction and installation of the cable tray and connection of the waiting tube into the tray ...................................16 2.1.8. Thi công cap cho hê thông bao chay / Cable construction for fire alarm systems............. 22 2.1.9. Quy trình kéo, rải cap, va đấu nôi cap / Process of pulling, laying cables, and connecting cables 23 2.2. Biên pháp thi công hê thông chữa cháy / Method for fire fighting system construction............ 30 2.2.1. Công tac chuân bi / Preparation.........................................................................................30 2.2.2. Biên phap thi công đương ông chưa chay / Method for construction of fire fighting pipeline 32 2.2.3. Bươc 4: Công tac thư ap đương ông/Step 4: Testing line pressure work ........................... 47 2.2.4. Lăp đăt thiêt bi/ Installation of equipment.......................................................................... 50 2.2.5. Công viêc hoan thiên/ Finished work ..................................................................................54
Trang 3/56 3. ĐIỀU KHOẢN THỰC HIỆN/ IMPLEMENTATION TERMS........................................ 55 4. HƯỚNG DẪN/BIỂU MẪU ĐÍNH KÈM/ ENCLOSED INSTRUCTION/FORM...........55 5. TÀI LIỆU THAM KHẢO/ REFERENCES...................................................................... 55 6. THEO DÕI SỬA ĐỔI/ MORNITOR THE MODIFICATION..........................................56
Trang 4/56 1. GIỚI THIỆU CHUNG / GENERAL INFORMATION 1.1. Mục đích / Purpose - Đảm bảo lắp đặt theo đúng bản vẽ thiết kế và yêu cầu kỹ thuật của dự án. Ensure installation in accordance with the shop drawings and technical requirements of the project. - Đảm bảo chất lượng và tôi ưu trong quá trình thi công. Ensure quality and optimization during construction. 1.2. Phạm vi áp dụng / Scope of Application - Biên pháp thi công này là cơ sở để Ban điều hành công trường hoàn thiên Biên pháp thi công lắp đặt hê thông phong cháy chữa cháy theo yêu cầu thực tế của Dự án. This construction measure is the basis for Project Management Board to complete the method of installing fire protection system according to the actual requirements of the project. - Áp dụng đôi với Phong Kỹ thuật đấu thầu, Phong QC, Phong Bảo hành, Phong T&C, Ban điều hành công trường. Applies to Tender Department, QC Department, Warranty Department, T & C Department, Project Management Board. 1.3. Thuật ngữ và định nghĩa / Terminology and definitions CĐT Chủ đầu tư / Owner BĐHCT Ban điều hành công trường / Project Management Board. BQLDA Ban Quản ly dự án / Project Management Unit TVGS Tư vấn giám sát / Supervision consultant 2. NỘI DUNG / CONTENTS 2.1. Biên pháp thi công hê thông báo cháy / Method for fire alarm system construction 2.1.1.Công tac chuân bi / Preparation 2.1.1.1. Lập bản vẽ thi công / Establishment of construction drawing - Dựa vào các cơ sở nêu trên và khảo sát thực tế tại hiên trường nhà thầu lập bản vẽ thi công hê thông báo cháy.