PDF Google Drive Downloader v1.1


Báo lỗi sự cố

Nội dung text 08 Kg Tupong Jaya - BQ.pdf

Item Description Unit Qty. Rate (RM) Amount (RM) A. Section A Temporary Works and Overhead Cost etc. A1 Allow for insurance of works. Item Item LS 1,000.00 A2 Item Item LS 500.00 A3 Allow for Workmen's Compensation and/or SOCSO. Item Item LS 500.00 A4 Item Item LS 3,000.00 A5 Item Item LS 300.00 A6 Item Item LS 3,000.00 A7 Item Item LS 3,000.00 A8 Item Item LS 500.00 A9 Signboard Item Item LS 500.00 A10 Site tidy up upon completion of works Item Item LS 500.00 SCHEDULE OF RATES NO. PROJEK: RTP/2023/3317/KCH/I/6a BINA BARU PARIT KONKRIT UNTUK KAWASAN KEDIAMAN PENDUDUK KAMPUNG TUPONG JAYA Allow for insurance against injuries and damages to property required under the contract. Allow for mobilization and demobilization of plants, machineries and equipments. Provide three (3) for colour photographs size 4R as directed showing the progress BEFORE, DURING & AFTER completion of works and soft copies in 16GB Pendrive to the S.O. Allow for reinstatement works of any damages to the existing tarseal road, nearby houses, trees, SESCO head lines and pipe lines during construction works and any access road that are potentially to be use by the contractor to transport the material to the site as well as during construction activities all include materials, plant and labours during the contract period. Allow for all temporary works, overhead costs and other costs incurred in carrying out the requirement of the contract not otherwise included in the schedule of rate. Allow for necessary traffic signages & safety light all inclusive supply and maintenance throughout the project period, sufficient to provide warning to peoples & traffic at the site. Total Section A Carried Forward to Summary of Contract 12,800.00 F/1

Tài liệu liên quan

x
Báo cáo lỗi download
Nội dung báo cáo



Chất lượng file Download bị lỗi:
Họ tên:
Email:
Bình luận
Trong quá trình tải gặp lỗi, sự cố,.. hoặc có thắc mắc gì vui lòng để lại bình luận dưới đây. Xin cảm ơn.