Nội dung text General Operating Procedure
Noobic Stratocracy Department of Energy Operations, Naramo Nuclear Plant Naramo Nuclear Plant, Naramo, NR 55123 07/13/2025 NOTICE TO: All ANRO Operations Staff FROM: Office of the Director, Reactor Operations, Naramo Nuclear Power Plant Inclosed in the following document is the current General Operating Procedure, with updated guidance to using the new turbine systems testing. The new turbine regulations should help you successfully and safely conduct operations. You should immediately familiarize yourself with the contents of this document, so you may be of assistance to those in the new update. Thank you for taking the time to ensure you are up to date with the full regulations and procedures for Naramo reactor operations. Lostnatlanta Lostnatlanta Reactor Operations Director [This section intentionally left blank]
SECRET//NOFORN SUBCHAPTER 1: Definitions 1: Coolant and Feedwater Systems 2: Control Rod Systems 3: Grid Control Systems 4: Miscellaneous SUBCHAPTER 2: Components and their use 1: Coolant Systems 2: Feedwater Systems 3: Rods Systems 4: Grid Systems and Electricity Generation 5: SCRAM Theory SUBCHAPTER 3: Normal Operations Checklists 1: Before Startup Checklist 2: Startup Checklist 3: Temperature Change Checklist 4: Turbine Sync Checklist SUBCHAPTER 4: Emergency Procedures 1: Feedwater Loss Checklist 2: Coolant Pump Loss Checklist 3: Unintentional Stall Checklist 4: SCRAM Procedure 4a: Prior to SCRAM checklist 4b: SCRAM Runup Checklist 4c: Meltdown Activation Checklist 4d: SCRAM ABORT Checlkist 4e: Rod Jam Checklist 4f: Summary rocedure Notes SUBCHAPTER 5: SIGNING AUTHORIT [This section intentionally left blank] SECRET//NOFORN