Nội dung text 2. Copy of building permit - 2019 04 03 GHMC Approval.pdf
To, PERMIT No. 1/C20/05550/2019 DATE 03 April, 2019 Sir / Madam, Sub: Ref: Building Permission - sanctioned - Reg Your Application dated: 06 September, 2018 u/s 388, 428 & 433 of HMC Act, 1955 & A.P. Urban Areas (Dev), Act, 1975 and A.P.Building Rules 2012. Your application submitted in the reference has been examined with reference to the rules and regulations in force and permission is hereby sanctioned conditionally as detailed below: : : Sri/Smt. FILE No. : 1/C20/17145/2018 SAS INFRA REP BY MANAGING PARTNER, Dr.GUDE VENKATESWAR RAO AND OTHERS H.NO:- 11-13-397, ALKAPRUI SROOR NAGAR, HYDERABAD., HYDERABAD, TELANGANA GREATER HYDERABAD MUNICIPAL CORPORATION BUILDING PERMIT ORDER TOWN PLANNING SECTION A APPLICANT AND LICENSED PERSONNEL DETAILS: 1 Applicant SAS INFRA REP BY MANAGING PARTNER, Dr.GUDE VENKATESWAR RAO AND OTHERS 2 Developer / Builder Licensed Technical Person 4 Structural Engineer Lic.No. Lic.No. Lic.No. SAS INFRA J SRISAILAM (Architect) MOHAN L BL/3445/2017 CA/2010/48405 351/Strl/Engineer/TP10/GHMC 3 5 Others NA B SITE DETAILS 1 T.S. No./Survey no./Gram khantam/Abadi 19 2 Premises No. NA 3 Plot No./Door No./House No. OPEN PLOT 4 Layout / Sub Divn. No. NA 5 Road/Street NA DETAILS OF PERMISSION SANCTIONED Locality C 6 Khajaguda (Circle 11) 7 Town/ City Hyderabad 1 Building Sanction Data Building - PROPOSED (TOWER B) (Height (m): 149.95) b Use No. Area (m2) No. Area (m2) Level No. Area (m2) a Floors Ground Upper floors Parking floors 1.1 c Residential 0 0.00 0 0.00 Cellar 0 0.00 d Commercial 1 2,677.87 36 104,191.56 G/U Floors 0 0.00 e Others 0 0.00 0 0.00 Stilt 0 0.00 f No. of floors 1 Ground + 36 upper floors g Set backs (m) 25.5 Side I 25.5 Side II 25.5 25.5 Front Rear e Compound Wall 266.75 RM Building - PROPOSED (TOWER A) (Height (m): 149.95) b Use No. Area (m2) No. Area (m2) Level No. Area (m2) a Floors Ground Upper floors Parking floors 1.2 c Residential 0 0.00 0 0.00 Cellar 6 220,516.68 d Commercial 1 8,037.25 36 369,679.49 G/U Floors 0 0.00 e Others 0 0.00 0 0.00 Stilt 0 0.00 f No. of floors 6 Cellar + Ground + 34 Upper Floor + Mezzanine Floor @ 24th and 25th Floor) g Set backs (m) 25.5 Side I 25.5 Side II 25.64 25.5 Front Rear e Compound Wall 266.75 RM 3 Plot Set backs (m) Front 25.50 Rear Side I Side II 25.50 25.50 25.50 No. of Tree 4 Site Area (m2) 43705.25 5 Road affected area (m2) 1867.87 7 Net Area(m2) 41837.38 8 Tot-lot (m2) 4322 10 No. of RWHPs 19 11 862 Trees 9 Height (m) 149.95 12 Others NA 6 Nala affected area (m2) 0 D DETAILS OF FEES (RS.) : Permit No: 1/C20/05550/2019 Page 1 of 4
1 Building Permit Fees : Proposed Covered builtup area 72,698,050.00 2 Building Permit Fees : Proposed compound wall 12,360.00 3 Building Permit Fees : Advertisment & Postage 5,000.00 Charges 4 Development Charges : Proposed built up area 60,573,375.00 5 109,032,075. 00 B.C. & E.B.C. on built up area, 6 Rain Water Harvesting Charges, 3,876,700.00 7 563,055,415. 00 City Level Infrastructure Impact Fees, 8 Environmental Impact Fees, 15,820,571.00 TOTAL: 825,073,546.00 E OTHER DETAILS : 1 Contractor’s all Risk Policy No. 560701441810000033 Date 17 September, 2018 Valid Upto 25 September, 2021 4292/2019 Floor handed over Area (m2) TA: G-4, TB: G-5 Floors 2 Date 03/13/2019 72714.93 Bk-1, CS NO 4364/2019 S.R.O. Ranga Reddy 3 Date 13 March, 2019 Notarised Affidavit No. Enter Sr. No. in prohibitory Property Watch Register 4 F Construction to be Commenced Before G Construction to be Completed Before 03 October, 2020 03 April, 2025 Permit No: 1/C20/05550/2019 Page 2 of 4
By order COMMISSIONER GHMC Copy To :- 1. The Manager Director, HMWS&SB. 2. The Director, T.S. TRANSCO, Hyderabad. 3. The Director General, Stamps and Registration Department, Hyderabad. 4. The Director General, Telangana State Disaster Response and Fire Services, Hyderabad. 5. The Neighbors (side1, side2 & rear). 6. The Licensed Technical Personnel / Structural Engineer / Builder. This is computer generated letter, doesn't require any signatures. TextToSearch Special Conditions for Proceeding Letter 1. The Owner / Developers shall ensure the safety of construction workers. 2. The Owner / Developers shall ensure a comprehensive insurance policy of construction workers for the duration of construction 3. In large projects where it is proposed to temporarily house the construction workers on the site, proper hygienic temporary shelter with drinking water and sanitary measures shall be provided. 4. The Owner / Developers shall be responsible for the safety of construction workers. 5. It in case above said conditions are not adhered; GHMC / Local Authority can withdraw the said permission. 6. To comply the conditions laid down in the G.O.Ms.No.168 MA, dt: 07-04-12.7) .The GHMC reserve the right to cancel the permission, if it is found that the permission is obtained by false statement or misinterpretation or suppression of any material facts or rule. 7. The applicant is the whole responsible if any discrepancy in the ownership documents and ULC aspects and if any litigation the technically approved building plans may withdraw without notice. 8. If any dispute litigation arises in future, regarding the ownership of a land the applicant shall responsible for the settlement of the same, GHMC are its employees shall not be a part to any such dispute / litigation. 9. The applicant / developer are the whole responsible if anything happens / while constructing the building. 10. Any conditions laid by the authority are applicable. 11. The Concerned Local Body shall ensure the same before issue of Occupancy Certificate or Commencement of Commercial Production by the applicant. 12. The building plans shall be sanctioned by the Local Authority in Conformity with the technically approved plans by GHMC 13. The building plan technically approved by GHMC is valid for a period of (6) years from the date of issue of this letter if the workis commenced within the one year from the date of issue 14. That the applicant should ensure to submit a compliance report to GHMC soon after completion of first floor level and then all the roofs are laid so as to enable to permit him to proceed further by inspection of site by. 15. It is also hereby ordered that the copy of approved plans as released by GHMC and local authority would be displayed at the construction site for public view 16. This permission does not bar any public agency including GHMC to acquire the lands for public purpose as per law. 17. The GHMC reserve the right to cancel the permission it is falls that the permission is obtained by framed misrepresentation OR by mistake of fact. Additional/Other 1. To comply the requirement prescribed under 5.f (xi) (iii) (iv), (v) & (vii) of GOMs.No.168 MA, dt:07.04.2012 2. To follow conditions stipulated in NOC from Fire Services Dept., and AAI. 3. The applicant has to follow Services, Utilities, Strom Water Disposal, Sewerage, Rain Water Harvesting Pits, Garbage Disposal etc., as per the plans submitted to GHMC 4. The applicant shall comply the conditions imposed by the Commissioner of Police, Cyberabad in the NOC vide License No. 178/2018-19 : No. A2/178/ESTABLISHMENT/CYB/2018-19, date:25.02.2019 Permit No: 1/C20/05550/2019 Page 4 of 4