PDF Google Drive Downloader v1.1


Báo lỗi sự cố

Nội dung text EIA S2 POS TENAU REV00 VOL I.pdf

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) SECOND SCHEDULE REV00 DECEMBER 2023 NMS/EIA/CHSB/DEC23/V1/REV00 MEMBINA JALAN BARU DARI POS TENAU, DAERAH MUALLIM, PERAK KE POS LABU/SENDERUT, DAERAH KUALA LIPIS, PAHANG JABATAN KERJA RAYA MALAYSIA Pasukan Projek Persekutuan Negeri Perak (PPPNP) Jabatan Kerja Raya Negeri Perak Darul Ridzuan Jalan Panglima Bukit Gantang Wahab, 30000 Ipoh, Perak Darul Ridzuan PROJECT EXECUTOR: CASA HARTAMAS SDN. BHD. No. 1, Lot 14019, Kg. Bukit Berapit, Jalan Kelantan, 21060, Kuala Terengganu, Terengganu DESIGN AND BUILD CONTRACTOR: CIVIL & STRUCTURAL CONSULTANT: PERUNDING IRZI SDN. BHD. 11-2, Jalan Impian Perdana 1, Saujana Impian, 43000 Kajang, Selangor JABATAN ALAM SEKITAR PUTRAJAYA KEMENTERIAN KEMAJUAN DESA DAN WILAYAH No. 47, Persiaran Perdana, Presint 4, Pusat Pentadbiran Kerajaan Persekutuan 62100 Putrajaya, Malaysia PROJECT OWNER: NILAIMAS SERVICES No 17, Jalan Equine 10D, Taman Equine, 43300 Seri Kembangan, Selangor Darul Ehsan ENVIRONMENTAL CONSULTANT: VOLUME 1: MAIN REPORT
LAPORAN PENILAIAN KESAN KEPADA ALAM SEKELILING (EIA) JADUAL KEDUA BAGI PROJEK MEMBINA JALAN BARU DARI POS TENAU, DAERAH MUALLIM, PERAK KE POS LABU/SENDERUT, DAERAH KUALA LIPIS, PAHANG (REKA DAN BINA) Document Information Project Title Laporan Penilaian Kesan Kepada Alam Sekeliling (EIA) Jadual Kedua Bagi Projek Membina Jalan Baru Dari Pos Tenau, Daerah Muallim, Perak Ke Pos Labu/Senderut, Daerah Kuala Lipis, Pahang (Reka Dan Bina) Subject Environmental Impact Assessment (EIA) Jadual Kedua Client Casa Hartamas Sdn. Bhd. Document NMS/EIA/CHSB/DEC23/REV00 Rev 00 Current Revision Approvals Name/Title Signature Date Prepared by Nurazlin Mat Rais & Yasmin Laily Romli NMR & YLR DEC 2023 Reviewed by Mohamad Affendi Ismail MAI DEC 2023 Approved by Dato’ Seri Ts. Hj. Mohd Nawahidudin Mahamad Isa NAWA DEC 2023 Document Revision History Rev Rev Date Description of Change/ Reason for Issue Prepared by Checked by Approved by Draft 20 November 2023 EIA NMR & YLR MAI NAWA 00 14 December 2023 EIA NMR & YLR MAI NAWA
CASA HARTAMAS SDN. BHD. (650197-D) No. 1, Lot 14019, Kg. Bukit Berapit, Jalan Kelantan, 21060, Kuala Terengganu, Terengganu. Tel: 09-6666431 Fax: 09-6664862 Email: [email protected] DECLARATION FROM PROJECT PROPONENT/MAIN CONTRACTOR (DESIGN AND BUILD) MEMBINA JALAN BARU DARI POS TENAU, DAERAH MUALLIM, PERAK KE POS LABU/SENDERUT, DAERAH KUALA LIPIS, PAHANG (REKA DAN BINA) UNTUK TETUAN CASA HARTAMAS SDN. BHD. PROJECT PROPONENT: CASA HARTAMAS SDN. BHD. I hereby declare that the entire EIA Report is the product of the Qualified Person (i.e. the EIA Consultant) engaged by my company and all the facts stated in the Report and the accompanying information are to the best of my knowledge and belief true and correct, and that I have not withheld or distorted any material facts. I agree and I undertake the responsibility to implement all the pollution prevention and mitigating measures (P2M2) described in the EIA Report, in the Environmental Management Plan (EMP), and in the LD-P2M2 as proposed by the EIA Consultant. I have allocated sufficient funds for the above purpose. Name : NRIC Number : Designation : Signature : Company’s Stamp : Date : Note: LD-P2M2 stands for Land Disturbing Pollution Prevention and Mitigation Measures Ismail Bin Mohamad Satdli 810106-01-5601 Project Manager 15/12/2023
No. 17, Level 2 & 3, Jalan Equine 10D, Taman Equine, 43300 Seri Kembangan, Selangor Tel: 03-89409959 Fax: 03-89409958 QUALIFIED PERSON’S DECLARATION MEMBINA JALAN BARU DARI POS TENAU, DAERAH MUALLIM, PERAK KE POS LABU/SENDERUT, DAERAH KUALA LIPIS, PAHANG (REKA DAN BINA) UNTUK TETUAN CASA HARTAMAS SDN. BHD. PROJECT PROPONENT: CASA HARTAMAS SDN. BHD I declare that the entire EIA Report is a product of my personal efforts and the collaborative work of my team members, who are also Qualified Persons working under my supervision. I assert that all the facts presented in the Report and accompanying information are tru and correct to the best of my knowledge, supported by the studies that have been conducted throughout the EIA implementation. Furthermore, I confirm that I have not withheld or distorted any material facts in the preparation of this document. I have provided a comprehensive overview of the Report’s content to the Project Proponent and emphasized all pollution prevention and mitigation measures (P2M2s) outlined within it, as well as those specified in the Environmental Management Plan (EMP) and the LD-P2M2*. The Project Proponent has expressed agreement to implement these measures. Name : DATO’ SERI Ts. Hj. MOHD NAWAHIDUDIN BIN MAHAMAD ISA NRIC Number : 711012-03-5421 Designation : TEAM LEADER Signature : .............................. Date: 15 December 2023 Consultant’s stamp: *Note: LD-P2M2 stands for Land Disturbing Pollution Prevention and Mitigation Measures.
NO. NAME QUALIFICATIONS REGISTRATION WITH DOE PROPOSED STUDY AREA SIGNATURE & CATEGORY AREA / FIELD ID NO. VALID DATE DATE A. EIA Study Team Leader 1. Dato’ Seri Ts. Hj. Mohd Nawahidudin Mahamad Isa B.Sc. Construction Management (Anglia Polytechnic University), Diploma Town Planning (UITM) EIA Consultant as Team Leader Social Impact Assessment & Socio-economic Study, Traffic Impact Assessment CEP- CS0270 31 May 2024 Traffic Impact Assessment, Social Impact Assessment, General Environmental Management B. EIA Study Team Member 1. Dr. Jayaraj Vijaya Kumaran B.Sc. (Hons)(Animal Resources Science and Management)(UMS), M.Sc (Quantitative Statistics and Molecular Genetics) (UMS), PhD (Mammalogy)(USM) Subject Specialist Ecological Studies, Wildlife Ecology & Management CEP- SS0291 31 May 2026 Flora & Fauna 2. Prof. Dr. Mohd Fadhil Bin Md Din B.Eng (Hons) (UKM), M. (UTM), PhD (UTM) EIA Consultant Water Quality Modelling CEP- CS0379 31 May 2025 Water Quality Modelling DECLARATION OF EIA TEAM MEMBERS MEMBINA JALAN BARU DARI POS TENAU, DAERAH MUALLIM, PERAK KE POS LABU/SENDERUT, DAERAH KUALA LIPIS, PAHANG (REKA DAN BINA) UNTUK TETUAN CASA HARTAMAS SDN. BHD.

Tài liệu liên quan

x
Báo cáo lỗi download
Nội dung báo cáo



Chất lượng file Download bị lỗi:
Họ tên:
Email:
Bình luận
Trong quá trình tải gặp lỗi, sự cố,.. hoặc có thắc mắc gì vui lòng để lại bình luận dưới đây. Xin cảm ơn.