PDF Google Drive Downloader v1.1


Báo lỗi sự cố

Nội dung text ĐÁP ÁN ĐỀ THI HSG ANH 9 NAM ĐỊNH 2021-2022.docx

1 SỞ GIÁO DỤC VÀ ĐÀO TẠO NAM ĐỊNH ĐỀ CHÍNH THỨC ĐỀ THI CHỌN HỌC SINH GIỎI NĂM HỌC 2021 - 2022 Môn: TIẾNG ANH – Lớp: 9 THCS Thời gian làm bài: 120 phút Đề thi gồm: 13 trang PART A. LISTENING (4.0 POINTS) Hướng dẫn phần thi nghe hiểu: - Nội dung phần nghe gồm 03 phần, mỗi thí sinh được nghe 2 lần, đĩa CD tự chạy 2 lần. - Mở đầu và kết thúc phần nghe có tín hiệu nhạc. - Hướng dẫn làm bài chi tiết cho thí sinh (bằng Tiếng Anh) đã có trong bài nghe. PART 1. Listen and decide whether the following statements are True (T) or False (F) according to what you hear. Write your answers in the spaces provided. (1.0 point) Question 1. Paul decided to get work experience in South America to improve his Spanish. F Question 2. The project Paul originally intended to get involved in was construction. F Question 3. Paul's first job was not well organized, so he changed the project. T Question 4. Paul learnt about the importance of developing trust in the village community. T Question 5. Paul was surprised to be given an extension to his contract. F TRANSCRIPT WOMAN: I’ve been reading your personal statement, Paul. First, let’s talk about your work experience in South America. What took you there? Was it to gain more fluency in Spanish? PAUL: Well, as I’m combining Spanish with Latin American studies, my main idea was to find out more about the way people lived there (Q1). My spoken Spanish was already pretty  good in fact. WOMAN: So you weren’t too worried about language barriers? PAUL: No. In fact, I ended up teaching English there, although that wasn’t my original choice of work. WOMAN: I see. How did you find out about all this? PAUL: I found an agency that runs all kinds of voluntary projects in South America. WOMAN: What kind of work? PAUL: Well, there were several possibilities. WOMAN: You mean construction? Engineering work? PAUL: Yes, getting involved in building projects was an option. Then there was tourism –taking tourists for walks around the volcanoes – which I actually chose to do (Q2), and then there was work with local farmers. WOMAN: But you didn’t  continue with that project. Why not?

3 C. poor maintenance of roads Question 2. Which change will shortly be made to the cycle path next to the river? A. It will be extended. B. It will be widened. C. It will be resurfaced. Question 3. Why have plans for a pedestrian crossing been postponed? A. Because the proposed location is unsafe. B. Because the Post Office has moved. C. Because funding is not available at present. Question 4. On Station Road, notices have been erected _____________. A. telling commuters to send their complaints about traffic and highways B. warning pedestrians to leave enough time when crossing the railway line C. asking motorists to switch off engines when waiting at the level crossing Question 5. What problems have cyclists in the town caused? A. They refuse to leave their bikes outside the ticket office. B. They leave their bikes chained to the railings outside the ticket office. C. They argue about having to breathe in car fumes outside the ticket office. TRANSCRIPT Right, next on the agenda we have traffic and highways. Councillor Thornton. Thank you. Well, we now have the results of the survey carried out last month about traffic and road transport in the town. People were generally satisfied with the state of the roads. There were one or two complaints about potholes, which will be addressed, but a significant number of people complained about the increasing number of heavy vehicles using our local roads to avoid traffic elsewhere. We had expected more complaints from commuters about the reduction in the train service, but it does not seem to have affected people too much. The cycle path that runs alongside the river is very well used by both cyclists and pedestrians since the surface was improved last year, but overtaking can be a problem, so we are going to add a bit on the side to make it wider. At some stage, we would like to extend the path so that it goes all the way through the town, but that would not be happening in the immediate future. The plans to have a pedestrian crossing next to the post office have unfortunately had to be put on hold for the time being. We budgeted for this to be done this financial year, but then there were rumors that the post office was going to move, which would have meant there was not really a need for a crossing. Now they have confirmed that they are staying where they are, but the highways department has told us that it would be dangerous to have a pedestrian crossing where we had originally planned it, as there is a bend in the road there, so that will need some more thought. On Station Road, near the station and level crossing, drivers can face quite long waits if the level crossing is closed, and we have now got signs up requesting them not to leave their engines running at that time. This

Tài liệu liên quan

x
Báo cáo lỗi download
Nội dung báo cáo



Chất lượng file Download bị lỗi:
Họ tên:
Email:
Bình luận
Trong quá trình tải gặp lỗi, sự cố,.. hoặc có thắc mắc gì vui lòng để lại bình luận dưới đây. Xin cảm ơn.