PDF Google Drive Downloader v1.1


Report a problem

Content text Plans (Civil)_2024-21-SD-Approved_2024-21-SD_104 Whitestone Plans.pdf

PROJECT LOCATION: LOT 2 W WHITESTONE BLVD N BELL BLVD WALTON WAY DISCOVERY BLVD LONE STAR DR CIVIL ENGINEERING AND PLANNING (972) 822 - 1682 TBPE FIRM REGISTRATION NO. F-22664 OF 104 W WHITESTONE BLVD SUBMITTED BY: . ANTHONY GOODE, P.E. DATE GOODE FAITH ENGINEERING, LLC. TBPE FIRM NO. F-22664 1620 LA JAITA DR. STE 300 CEDAR PARK, TX 78613 P: (972)822-1682 RELEASE OF THIS APPLICATION DOES NOT CONSTITUTE A VERIFICATION OF ALL DATA, INFORMATION AND CALCULATIONS SUPPLIED BY THE APPLICANT. THE ENGINEER OF RECORD IS SOLELY RESPONSIBLE FOR THE COMPLETENESS, ACCURACY, AND ADEQUACY OF HIS/HER SUBMITTAL, WHETHER OR NOT THE APPLICATION IS REVIEWED FOR CODE COMPLIANCE BY CITY ENGINEERS. DRAWN BY DATE DWL 11/08/2024 CHECKED BY PROJECT NO. AHG 2024-21-SD 24 Number Description Revise (R) Add (A) Void (V) Sheet No.s Total # Sheets in Plan Set Net Change Imp. Cover (sq. ft.) Total Site Imp. Cover (sq. ft.)/% City of Cedar Park Approval - Date Date Imaged 1 2 3 4 5 COVER 01 N 0 1000' 2000' 4000' Scale: 1" = 2000' Sheet Number Sheet Title 01 COVER 02 GENERAL NOTES 03 FINAL PLAT 04 PREDEVELOPMENT SITE CONDITIONS 05 EXISTING SITE & DEMOLITION PLAN 06 EROSION CONTROL PLAN 07 EROSION CONTROL NOTES 08 SITE PLAN 09 GRADING PLAN 10 EXISTING DRAINAGE PLAN 11 PROPOSED DRAINAGE PLAN 12 POND PLAN 13 UTILITY PLAN 14 FIRE PROTECTION PLAN 15 TREE PRESERVATION PLAN 16 STANDARD DETAILS (1 OF 3) 17 STANDARD DETAILS (2 OF 3) 18 STANDARD DETAILS (3 OF 3) 19 LANDSCAPE (1 OF 2) 20 LANDSCAPE (2 OF 2) 21 ARCHTECTURAL ELEVATIONS (1 OF 3) 22 ARCHTECTURAL ELEVATIONS (2 OF 3) 23 ARCHTECTURAL ELEVATIONS (3 OF 3) 24 PHOTOMETRIC PLAN 104 W WHITESTONE BLVD SITE DEVELOPMENT CEDAR PARK, TX JULY 2024 TDLR #TABS2024022967 1ST SUBMITTAL TO CITY 07/15/2024 2ND SUBMITTAL TO CITY 08/26/2024 SPECIAL CONSTRUCTION NOTES: 1. CONTRACTOR SHALL CALL "DIG-TESS" SYSTEM (1-800-344-8377) FOR UTILITY LOCATIONS PRIOR TO ANY WORK IN CITY OR COUNTY EASEMENTS OR STREET R.O.W. 2. CONTRACTOR SHALL POT HOLE ALL EXISTING UTILITIES AT CONNECTION AND INTERSECTION PRIOR TO UTILITY MATERIALS BEING DELIVERED TO SITE. 3. ALL SITE WORK MUST ALSO COMPLY WITH ENVIRONMENTAL REQUIREMENTS. 4. ALL CONSTRUCTION OPERATIONS SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THE CITY OF AUSTIN STANDARD SPECIFICATIONS ITEM NO. 509 AND APPLICABLE REGULATIONS OF THE U.S. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA). COPIES OF OSHA STANDARDS MAY BE PURCHASED FROM THE U.S. GOVERNMENT PRINTING OFFICE; INFORMATION AND RELATED REFERENCE MATERIALS MAY BE PURCHASED FROM OSHA, 611 E. 6TH STREET, AUSTIN, TEXAS. 5. THIS PROJECT IS LOCATED WITHIN THE SPANISH OAK CREEK WATERSHED. 6. NO PORTION OF THIS PROJECT IS WITHIN THE 100-YEAR FLOODPLAIN AS PER FEMA FIRM PANEL 48491C0464F AS DATED 12/20/2019, FOR WILLIAMSON COUNTY, TEXAS. 7. A TEMPORARY CERTIFICATE OF OCCUPANCY (TCO) WILL NOT BE ISSUED BY THE CITY OF CEDAR PARK UNTIL THE CONTRACTOR PROVIDES A LETTER OF AUTHORIZATION THAT THE DETENTION MAINTENANCE ON THE EXISTING POND HAS BEEN MAINTAINED PER PLANS. 8. THIS SITE IS WITHIN THE EDWARDS AQUIFER CONTRIBUTING ZONE. 9. ALL RESPONSIBILITY FOR ACCURACY OF THESE PLANS REMAIN WITH THE ENGINEER WHO PREPARED THEM. IN REVIEWING THESE PLANS, THE CITY OF CEDAR PARK MUST RELY ON THE ADEQUACY OF THE WORK OF DESIGN ENGINEER. 10. ENGINEER PERFORMED A SITE VISIT ON 08/03/2024 TO CONFIRM 15 YEARS OF NOTABLE DRIVEWAY USE AND PERFORMANCE TO BE IN GOOD AND ACCEPTABLE CONDITION FOR MANAGING 90,000# LOADS. CONTRACTOR TO MATCH EXISTING CONDITIONS WITH PATCHES TO ASPHALT, CONCRETE, AND SUBGRADE CONDITIONS. THERE ARE NO PAVING CHANGES SCHEDULED TO THE EXISTING FIRE LANE. 11. ENGINEER PERFORMED A SITE VISIT OF 08/03/2024 TO CONFIRM THE CONDITIONS OF THE EXISTING DETENTION POND AND REVIEWED THE PLANS FROM PROJECT SD-06-00019-28S PERTAINING TO THE DESIGN OF THE EXISTING DETENTION FACILITIES AND AGREES WITH THEIR DESIGN. PROPOSED DEVELOPMENT DOES NOT ADVERSELY AFFECT ANY DOWNSTREAM PROPERTIES. THE POND HAS BEEN MAINTAINED AND IS OPERATING AS DESIGNED AND PERMITTED. PROJECT DESCRIPTION: REDEVELOPMENT OF LOT 2 OF THE GEORGETOWN EXPRESS SUBDIVISION FOR THE INSTALLATION OF A MODULAR BUILDING, PARKING, AND ACCESS FOR A DRIVE THROUGH COFFEE SHOP. NO NEW DOMESTIC NOR IRRIGATION IS REQUESTED IN THIS PROJECT, EXISTING CONDITIONS TO REMAIN. NO NEW PRIVATE FIRE LANE IS PROPOSED ON THIS PROJECT. Date Date Date Date Date Date Site Development Permit Number Planning Engineering Services Industrial Pretreatment Fire Prevention Landscape Planner Addressing Reviewed for Code Compliance Signature required from all Departments LEGAL DESCRIPTION: LOT 1 OF ADJACENT PROPERTY (SAME PLAT) FOR 200 W WHITESTONE BLVD, CEDAR PARK, TX 78613: S9778 - GEORGETOWN EXPRESS SUB, LOT 1, ACRES 0.722 LEGAL DESCRIPTION: LOT 2 AT 104 W WHITESTONE BLVD, CEDAR PARK, TX 78613: S9778 - GEORGETOWN EXPRESS SUB, LOT 2 ACRES 0.779 EASEMENTS ASSOCIATED WITH THIS DEVELOPMENT INCLUDE: ROADWAY DEDICATION EASEMENT #2024089073 DRAINAGE EASEMENT #2024089075 ACCESS EASEMENT #2024089074 PEDESTRIAN EASEMENT #2024089072 3RD SUBMITTAL TO CITY 09/27/2024 4TH SUBMITTAL TO CITY 11/08/2024 2024-21-SD APPROVED December 18, 2024 City of Cedar Park Development Services Department
CIVIL ENGINEERING AND PLANNING (972) 822 - 1682 TBPE FIRM REGISTRATION NO. F-22664 OF NO. REVISIONS ENGINEERED BY APPROVAL DATE DESCRIPTION 1. 2. 3. 4. 5. 6. DATE 11/08/2024 PROJECT NO. 2024-21-SD DESIGNED BY DWL CHECKED BY AHG 24 104 W WHITESTONE BLVD GENERAL NOTES 02 CONSTRUCTION NOTES FOR SUBDIVISIONS AND SITE PLANS CONSTRUCTION NOTES FOR SUBDIVISIONS & SITE PLANS CITY OF CEDAR PARK REVISED APRIL 2, 2024 GENERAL NOTES: 1. GENERAL CONTRACTOR SHALL CALL FOR ALL UTILITY LOCATES PRIOR TO ANY CONSTRUCTION. CONTRACTOR SHALL DELINEATE AREAS OF EXCAVATION USING WHITE PAINT (WHITE LINING) IN ACCORDANCE WITH 16 TAC 18.3. WATER & WASTEWATER OWNED BY THE CITY OF CEDAR PARK CAN BE LOCATED BY CALLING TEXAS 811 AT 1- 800-344-8377. ALLOW THREE BUSINESS DAYS FOR UTILITY LOCATES BY THE CITY OF CEDAR PARK. 2. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST CITY OF AUSTIN STANDARD SPECIFICATIONS. CITY OF AUSTIN STANDARDS SHALL BE USED UNLESS OTHERWISE NOTED. 3. DESIGN PROCEDURES SHALL BE IN GENERAL COMPLIANCE WITH THE CITY OF AUSTIN DRAINAGE CRITERIA MANUAL. ALL VARIANCES TO THE MANUAL ARE LISTED BELOW: 4. BENCHMARKS SHOULD BE TIED TO THE CITY OF CEDAR PARK BENCHMARKS AND BE CORRECTLY "GEO- REFERENCED" TO STATE PLANE COORDINATES. A LIST OF THE CITY'S BENCHMARKS CAN BE FOUND AT: HTTP://WWW.CEDARPARKTEXAS.GOV/INDEX.ASPX?PAGE=793. TBM #1 - TRIANGLE CUT ON TOP OF CURB. (2,069.59 FEET TO CP MONUMENT 32) NORTHING: 10161715.1604 EASTING: 3084267.7290 LATITUDE: N030° 31' 11.80" LONGITUTDE: W097° 49' 53.37" ELEV: 990.79' NAVD 83 TBM #2 - SQUARE CUT ON CONCRETE FOOTING (2,275.75 FEET TO CP MONUMENT 32) NORTHING: 10161815.9801 EASTING: 3084448.5482 LATITUDE: N030° 31' 12.76" LONGITUDE: W097° 49' 51.28" ELEV: 986.50' NAVD 83 GPS MONUMENT 32 BENCHMARK: CEDAR PARK 32 (3" BRASS RING IN CONCRETE) NORTHING: 10160538.83 EASTING: 3082564.95 LATITUDE: 30° 31' 00.7391" LONGITUDE: 97° 50' 13.0627" ELEV: 989.24 NAVD 88 5. PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY FOR A SITE DEVELOPMENT PERMIT, THE RIGHT OF WAY BETWEEN THE PROPERTY LINE AND EDGE OF PAVEMENT / BACK OF CURB SHALL BE REVEGETATED ACCORDING TO COA SPECIFICATION 602S AND 606S. PRIOR TO CITY ACCEPTANCE OF SUBDIVISION IMPROVEMENTS ALL GRADED AND DISTURBED AREAS SHALL BE RE-VEGETATED IN ACCORDANCE WITH THE CITY OF AUSTIN SPECIFICATION ITEM #604 NATIVE SEEDING UNLESS NON- NATIVE IS SPECIFICALLY APPROVED. 6. THE CONTRACTOR SHALL PROVIDE THE CITY OF CEDAR PARK COPIES OF ALL TEST RESULTS PRIOR TO ACCEPTANCE OF SUBDIVISION IMPROVEMENTS. 7. CITY, OWNER, ENGINEER, CONTRACTOR, REPRESENTATIVES OF ALL UTILITY COMPANIES, AND A REPRESENTATIVE FROM THE TESTING LAB SHALL ATTEND PRE-CONSTRUCTION CONFERENCE PRIOR TO START OF CONSTRUCTION. THE CONTRACTOR SHALL SCHEDULE THE MEETING WITH THE CITY OF CEDAR PARK ENGINEERING DEPARTMENT A MINIMUM OF 48 HOURS PRIOR TO THIS PRE-CONSTRUCTION MEETING (512-401-5000). FINAL CONSTRUCTION PLANS SHALL BE DELIVERED TO ENGINEERING A MINIMUM OF SEVEN BUSINESS DAYS PRIOR TO REQUESTING A PRE-CONSTRUCTION MEETING. 8. EXCESS SOIL SHALL BE REMOVED AT THE CONTRACTOR'S EXPENSE. NOTIFY THE CITY OF CEDAR PARK IF THE DISPOSAL SITE IS INSIDE THE CITY'S JURISDICTIONAL BOUNDARIES. 9. BURNING IS PROHIBITED. 10. ANY CHANGES OR REVISIONS TO THESE PLANS MUST FIRST BE SUBMITTED TO THE CITY BY THE DESIGN ENGINEER FOR REVIEW AND WRITTEN APPROVAL PRIOR TO CONSTRUCTION OF THE REVISION. ALL CHANGES AND REVISIONS MADE TO THE DESIGN OF UTILITIES OR IMPACTS UTILITIES SHALL USE REVISION CLOUDS TO HIGHLIGHT ALL REVISIONS OR CHANGES WITH EACH SUBMITTAL. REVISION TRIANGLES SHALL BE USED TO MARK REVISIONS. ALL CLOUDS AND TRIANGLE MARKERS FROM PREVIOUS REVISIONS MAY BE REMOVED. REVISION INFORMATION SHALL BE UPDATED IN THE APPROPRIATE AREAS OF THE TITLE BLOCK. 11.MINIMUM SETBACK REQUIREMENTS FOR EXISTING AND NEWLY PLANTED TREES FROM THE EDGE OF PAVEMENT TO CONFORM TO THE REQUIREMENTS AS SHOWN IN TABLE 6-1 OF THE CITY OF AUSTIN'S TRANSPORTATION CRITERIA MANUAL. 12. THE CONTRACTOR WILL REIMBURSE THE CITY FOR ALL COST INCURRED AS A RESULT OF ANY DAMAGE TO ANY CITY UTILITY OR ANY INFRASTRUCTURE WITHIN THE RIGHT-OF-WAY BY THE CONTRACTOR, REGARDLESS OF THESE PLANS. 13. AN ENGINEER'S CONCURRENCE LETTER AND ELECTRONIC 22”X34” RECORD DRAWINGS SHALL BE SUBMITTED TO THE ENGINEERING DEPARTMENT PRIOR TO THE ISSUANCE OF CERTIFICATE OF OCCUPANCY OR SUBDIVISION ACCEPTANCE. THE ENGINEER AND CONTRACTOR SHALL VERIFY THAT ALL FINAL REVISIONS AND CHANGES HAVE BEEN MADE TO RECORD DRAWINGS PRIOR TO CITY SUBMITTAL. RECORD CONSTRUCTION DRAWINGS, INCLUDING ROADWAY AND ALL UTILITIES, SHALL BE PROVIDED TO THE CITY IN AUTOCAD “. DWG” FILES AND “.PDF” FORMAT ON A CD OR DVD. LINE WEIGHTS, LINE TYPES AND TEXT SIZE SHALL BE SUCH THAT IF HALF-SIZE PRINTS (11”X 17”) WERE PRODUCED, THE PLANS WOULD STILL BE LEGIBLE. ALL REQUIRED DIGITAL FILES SHALL CONTAIN A MINIMUM OF TWO (2) CONTROL POINTS REFERENCED TO THE STATE PLANE GRID COORDINATE SYSTEM - TEXAS CENTRAL ZONE (4203), IN US FEET AND SHALL INCLUDE ROTATION INFORMATION AND SCALE FACTOR REQUIRED TO REDUCE SURFACE COORDINATES TO GRID COORDINATES IN US FEET. 14. THE CITY OF CEDAR PARK HAS NOT REVIEWED THESE PLANS FOR COMPLIANCE WITH THE AMERICANS WITH DISABILITIES ACT. IT IS THE RESPONSIBILITY OF THE OWNER TO PROVIDE COMPLIANCE WITH ALL LEGISLATION RELATED TO ACCESSIBILITY WITHIN THE LIMITS OF CONSTRUCTION SHOWN IN THESE PLANS. 15. ALL RESPONSIBILITY FOR THE ADEQUACY OF THESE PLANS REMAINS WITH THE ENGINEER WHO PREPARED THEM. IN REVIEWING THESE PLANS, THE CITY OF CEDAR PARK MUST RELY ON THE ADEQUACY OF THE WORK OF THE DESIGN ENGINEER. 16.NO BLASTING IS ALLOWED ON THIS PROJECT. 17. A TRAFFIC CONTROL PLAN, IN ACCORDANCE WITH THE TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, SHALL BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL PRIOR TO ANY PARTIAL OR COMPLETE ROADWAY CLOSURES. TRAFFIC CONTROL PLANS SHALL BE SITE SPECIFIC AND SEAL BY A REGISTERED PROFESSIONAL ENGINEER. 18. THE CONTRACTOR SHALL KEEP THE SITE CLEAN AND MAINTAINED AT ALL TIMES, TO THE SATISFACTION OF THE CITY. THE SUBDIVISION WILL NOT BE ACCEPTED (OR CERTIFICATE OF OCCUPANCY ISSUED) UNTIL THE SITE HAS BEEN CLEANED TO THE SATISFACTION OF THE CITY. 19. SIGNS ARE NOT PERMITTED IN PUBLIC UTILITY EASEMENTS, SET BACKS OR DRAINAGE EASEMENTS. 20.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO INSPECT TEMPORARY EROSION CONTROLS ON A DAILY BASIS. ADJUST THE CONTROLS AND/OR REMOVE ANY SEDIMENT BUILDUP AS NECESSARY. A STOP WORK ORDER AND/OR FINE MAY BE IMPOSED IF THE EROSION CONTROLS ARE NOT MAINTAINED. 21. A FINAL CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED ON COMMERCIAL SITES UNTIL ALL DISTURBED AREAS HAVE BEEN RE-VEGETATED. SUBSTANTIAL GRASS COVER, AS DETERMINED BY ENGINEERING DEPARTMENT, MUST BE ACHIEVED PRIOR TO THE ISSUANCE OF A FINAL CERTIFICATE OF OCCUPANCY. ALL EROSION CONTROLS MUST REMAIN IN PLACE AND MAINTAINED UNTIL ALL DISTURBED AREAS HAVE BEEN RE-VEGETATED TO THE ACCEPTANCE OF THE CITY OF CEDAR PARK ENGINEERING DEPARTMENT. PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY FOR A SITE DEVELOPMENT PERMIT, THE RIGHT OF WAY BETWEEN THE PROPERTY LINE AND EDGE OF PAVEMENT / BACK OF CURB SHALL BE REVEGETATED ACCORDING TO COA SPECIFICATION 602S AND 606S. 22.CONTRACTOR WILL BE RESPONSIBLE FOR KEEPING ROADS AND DRIVES ADJACENT TO AND NEAR THE SITE FREE FROM SOIL, SEDIMENT AND DEBRIS. CONTRACTOR WILL NOT REMOVE SOIL, SEDIMENT OR DEBRIS FROM ANY AREA OR VEHICLE BY MEANS OF WATER, ONLY SHOVELING AND SWEEPING WILL BE ALLOWED. CONTRACTOR WILL BE RESPONSIBLE FOR DUST CONTROL FROM THE SITE. FAILURE TO COMPLY WITH THIS REQUIREMENT MAY RESULT IN A STOP WORK ORDER OR A FINE. 23. ALL WET UTILITIES SHALL BE INSTALLED AND ALL DENSITIES MUST HAVE PASSED INSPECTION(S) PRIOR TO THE INSTALLATION OF DRY UTILITIES. 24. A MINIMUM OF SEVEN DAYS OF CURE TIME IS REQUIRED FOR HMAC PRIOR TO THE INTRODUCTION OF VEHICULAR TRAFFIC TO ANY STREETS. 25.PRIOR TO PLAN APPROVAL, THE ENGINEER SHALL SUBMIT TO THE ENGINEERING DEPARTMENT DOCUMENTATION OF SUBDIVISION/SITE REGISTRATION WITH THE TEXAS DEPARTMENT OF LICENSING AND REGULATIONS (TDLR) AND PROVIDE DOCUMENTATION OF REVIEW AND COMPLIANCE OF THE SUBDIVISION/SITE CONSTRUCTION PLANS WITH TEXAS ARCHITECTURAL BARRIERS ACT (TABA). 26.PRIOR TO SUBDIVISION/SITE ACCEPTANCE, THE ENGINEER/DEVELOPER-OWNER SHALL SUBMIT TO THE ENGINEERING DEPARTMENT DOCUMENTATION THAT THE SUBDIVISION/SITE WAS INSPECTED BY TDLR OR A REGISTERED ACCESSIBILITY SPECIALIST (RAS) AND THE SUBDIVISION/SITE IS IN COMPLIANCE WITH THE REQUIREMENTS OF THE TABA. 27. ALL CONSTRUCTION AND CONSTRUCTION RELATED ACTIVITIES SHALL BE PERFORMED MONDAY THRU FRIDAY FROM 7:00 A.M. TO 6:00 P.M. HOWEVER, CONSTRUCTION ACTIVITIES WITHIN ONE HUNDRED FEET (100') OF A DWELLING OR DWELLING UNIT SHALL BE PERFORMED BETWEEN THE HOURS OF 8:00 AND 6:00 P.M. OTHERWISE ALL CONSTRUCTION AND CONSTRUCTION RELATED ACTIVITIES SHALL CONFORM TO CITY OF CEDAR PARK CODE OF ORDINANCES, SPECIFICALLY ARTICLE 8.08. 28. APPROVAL FOR CONSTRUCTION ACTIVITIES PERFORMED ON OWNER'S HOLIDAYS, AND/OR SATURDAYS, OUTSIDE OF MONDAY THROUGH FRIDAY 8 AM TO 5 PM, OR IN EXCESS OF 8 HOURS PER DAY SHALL BE OBTAINED IN WRITING 48 HOURS IN ADVANCE, AND INSPECTION FEES AT 1.5 TIMES THE HOURLY INSPECTION RATE SHALL BE BILLED DIRECTLY TO THE CONTRACTOR. THERE SHALL BE NO CONSTRUCTION OR CONSTRUCTION RELATED ACTIVITIES PERFORMED ON SUNDAY. THE CITY RESERVES THE RIGHT TO REQUIRE THE CONTRACTOR TO UNCOVER ALL WORK PERFORMED WITHOUT CITY INSPECTION. 29. ALL POLES TO BE APPROVED BY CITY AND PEC, NO CONDUIT SHALL BE INSTALLED DOWN LOT LINES / BETWEEN HOMES. ALL CONDUIT SHALL BE LOCATED IN THE PUBLIC ROW OR IN AN EASEMENT ADJACENT TO AND PARALLEL TO THE PUBLIC ROW. 30.DRY UTILITIES SHALL BE INSTALLED AFTER SUBGRADE IS CUT AND BEFORE FIRST COURSE BASE. NO TRENCHING OF COMPACTED BASE. IF NECESSARY DRY UTILITIES INSTALLED AFTER FIRST COURSE BASE SHALL BE BORED ACROSS THE FULL WIDTH OF THE ROW. 31.NO PONDING OF WATER SHALL BE ALLOWED TO COLLECT ON OR NEAR THE INTERSECTION OF PRIVATE DRIVEWAY(S) AND A PUBLIC STREET. RECONSTRUCTION OF THE DRIVEWAY APPROACH SHALL BE AT THE CONTRACTOR'S EXPENSE. 32. ALL DRIVEWAY APPROACHES SHALL HAVE A UNIFORM TWO PERCENT SLOPE WITHIN THE ROW UNLESS APPROVED IN WRITING BY THE ENGINEERING DEPARTMENT. 33.CONTRACTORS ON SITE SHALL HAVE AN APPROVED SET OF PLANS AT ALL TIMES. FAILURE TO HAVE AN APPROVED SET MAY RESULT IN A STOP WORK ORDER. 34.CONTRACTOR TO CLEAR FIVE FEET BEYOND ALL RIGHT OF WAY TO PREVENT FUTURE VEGETATIVE GROWTH INTO THE SIDEWALK AREAS. 35. THERE SHALL BE NO WATER OR WASTEWATER APPURTENANCES, INCLUDING BUT NOT LIMITED TO, VALVES, FITTINGS, METERS, CLEAN-OUTS, MANHOLES, OR VAULTS IN ANY DRIVEWAY, SIDEWALK, TRAFFIC OR PEDESTRIAN AREA. 36. SIDEWALKS SHALL NOT USE CURB INLETS AS A PARTIAL WALKING SURFACE. SIDEWALKS SHALL NOT USE TRAFFIC CONTROL BOXES, METER OR CHECK VALVE VAULTS, COMMUNICATION VAULTS, OR OTHER BURIED OR PARTIALLY BURIED INFRASTRUCTURE AS A VEHICULAR OR PEDESTRIAN SURFACE. STREET NOTES: 1. NO TRENCHING OF COMPACTED BASE WILL BE ALLOWED. A PENALTY AND/OR FINE MAY BE IMPOSED TO THE GENERAL CONTRACTOR IF TRENCHING OF COMPACTED BASE OCCURS WITHOUT CITY APPROVAL, REGARDLESS OF WHO PERFORMED THE TRENCHING. 2. ALL SIDEWALKS SHALL COMPLY WITH THE AMERICANS WITH DISABILITIES ACT. THE CITY OF CEDAR PARK HAS NOT REVIEWED THESE PLANS FOR COMPLIANCE WITH THE AMERICANS WITH DISABILITIES ACT, OR ANY OTHER ACCESSIBILITY LEGISLATION, AND DOES NOT WARRANTY OR APPROVE THESE PLANS FOR ANY ACCESSIBILITY STANDARDS. 3. STREET BARRICADES SHALL BE INSTALLED ON ALL DEAD END STREETS AND AS NECESSARY DURING CONSTRUCTION TO MAINTAIN JOB SAFETY. 4. ANY DAMAGE CAUSED TO EXISTING PAVEMENT, CURBS, SIDEWALKS, RAMPS, ETC., SHALL BE REPAIRED BY THE CONTRACTOR TO THE SATISFACTION OF THE CITY PRIOR TO ACCEPTANCE OF THE SUBDIVISION. 5. AT INTERSECTIONS, WHICH HAVE VALLEY DRAINAGE, THE CROWN TO THE INTERSECTING STREET WILL BE CULMINATED AT A DISTANCE OF 40 FT. FROM THE INTERSECTING CURB LINE UNLESS OTHERWISE NOTED. 6. THE SUBGRADE MATERIAL WAS TESTED BY (NAME, ADDRESS & PHONE NUMBERS) ON (DATE) THE PAVEMENT SECTIONS WERE DESIGNED ACCORDINGLY. THE PAVEMENT SECTIONS ARE TO BE CONSTRUCTED AS FOLLOWS: REFER TO COVER SHEET, NOTE #10 7. DENSITY TESTING OF COMPACTED SUBGRADE MATERIAL, FIRST COURSE AND SECOND COURSE COMPACTED BASE, SHALL BE MADE AT 500 FOOT INTERVALS. 8. ALL DENSITY TESTING IS THE RESPONSIBILITY OF THE OWNER OR CONTRACTOR AND SHALL BE WITNESSED BY THE CITY OF CEDAR PARK'S PROJECT REPRESENTATIVE. THE CONTRACTOR IS TO NOTIFY THE CITY 48 HOURS PRIOR TO SCHEDULED DENSITY TESTING. 9. TRAFFIC CONTROL SIGNS AND PAVEMENT MARKINGS SHALL BE IN ACCORDANCE WITH THE TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES AND INSTALLED AS DIRECTED BY THE CITY OF CEDAR PARK PRIOR TO CITY ACCEPTANCE OF THE SUBDIVISION. 10. SLOPE OF NATURAL GROUND ADJACENT TO THE RIGHT-OF-WAY SHALL NOT EXCEED 3:1. IF A 3:1 SLOPE IS NOT POSSIBLE, A RETAINING WALL OR SOME OTHER FORM OF SLOPE PROTECTION APPROVED BY THE CITY SHALL BE PLACED IN A LOCATION ACCEPTABLE TO THE CITY. 11. THE CITY, ENGINEER, CONTRACTOR, AND A REPRESENTATIVE FROM THE ASPHALT TESTING LAB SHALL ATTEND A PRE-PAVING CONFERENCE PRIOR TO THE START OF HMAC PAVING. THE CONTRACTOR SHALL GIVE THE CITY A MINIMUM OF 48 HOURS NOTICE PRIOR TO THIS MEETING (512-401-5000). 12. THE CONTRACTOR OR OWNER IS RESPONSIBLE FOR CONDUCTING TESTS ON ASPHALT PAVEMENT IN ACCORDANCE WITH THE REQUIREMENTS SET FORTH IN THE CITY OF AUSTIN STANDARD SPECIFICATION NO. 340. ANY RE-TESTING OF THE ASPHALT PAVEMENT SHALL BE CONDUCTED UNDER THE SUPERVISION OF THE ENGINEER AND THE CITY OF CEDAR PARK. RE-TESTING OF THE ASPHALT PAVEMENT SHALL BE LIMITED TO ONE RETEST PER PROJECT. 13. ALL PAVEMENT MARKINGS AND SIGNAGE SHALL COMPLY WITH MUTCD STANDARDS. STREET NAME LETTER SIZING SHALL BE IN ACCORDANCE WITH MUTCDTABLE2D-2.PAVEMENT MARKINGS SHALL BE THERMOPLASTIC UNLESS OTHERWISE NOTED. 14. ALL STREET NAME SIGNS SHALL BE HIGH INTENSITY RETRO GRADE. 15.NO FENCING OR WALL IS ALLOWED TO BE CONSTRUCTED SO THAT IT OBSTRUCTS THE SIGHT LINES OF DRIVERS FROM AN INTERSECTING PUBLIC ROADWAY OR FROM AN INTERSECTING PRIVATE DRIVEWAY. SIGHT LINES ARE TO BE MAINTAINED AS DESCRIBED IN CITY CODE SECTION 14.05.007. INSTALLING A FENCE OR WALL WHICH DOES NOT COMPLY WITH THE CITY'S SIGHT DISTANCE REQUIREMENTS OR FENCING REGULATIONS IS A VIOLATION OF THE CITY'S ORDINANCE AND MAY BE PUNISHABLE PURSUANT TO SECTION 1.01.009 OF CITY CODE. 16. TEMPORARY ROCK CRUSHING OPERATIONS ARE NOT ALLOWED. ALL SOURCES FOR FLEXIBLE BASE MATERIAL ARE REQUIRED TO BE APPROVED BY THE CITY. PRIOR TO BASE PLACEMENT ALL CURRENT TRIAXIAL TEST REPORTS FOR THE PROPOSED STOCKPILES ARE TO BE SUBMITTED TO THE CITY'S PROJECT REPRESENTATIVE FOR REVIEW AND APPROVAL. 17.UTILITY SERVICE BOXES OR OTHER UTILITY FACILITIES SHALL NOT BE INSTALLED WITHIN AREAS DETERMINED TO BE REQUIRED SIGHT LINES OF TWO INTERSECTING PUBLIC STREETS OR WITHIN SIGHT LINES OF A PRIVATE DRIVEWAY. SIGHT LINES ARE TO BE MAINTAINED COMPLIANT WITH TABLE 1-1 OF THE AUSTIN TRANSPORTATION CRITERIA MANUAL. UTILITIES DETERMINED BY THE DIRECTOR OF ENGINEERING TO BE PLACED WITHIN REQUIRED SIGHT LINES MAY BE REQUIRED TO BE RELOCATED AT THE EXPENSE OF THE CONTRACTOR PRIOR TO THE CITY ISSUING A CERTIFICATE OF OCCUPANCY OR PRIOR TO THE CITY'S ACCEPTANCE OF THE PROJECT IMPROVEMENTS. 18. ALL LANE CLOSURES SHALL OCCUR ONLY BETWEEN THE HOURS OF 9 AM AND 4 PM. ANY NIGHT TIME LANE CLOSURES REQUIRE APPROVAL BY THE DIRECTOR OF ENGINEERING AND SHALL OCCUR BETWEEN THE HOURS OF 8 PM AND 6 AM. LANE CLOSURES OBSERVED BY CITY DURING THE PEAK HOURS OF 6 AM TO 9 AM, OR 4 PM TO 8 PM WILL BE SUBJECT TO FINE PER CHAPTER 1 OF CITY ORDINANCE, AND/OR SUBSEQUENT ISSUANCE OF WORK STOPPAGE. 19.IMPROVEMENTS THAT INCLUDE RECONSTRUCTION OF AN EXISTING TYPE II DRIVEWAY SHALL BE DONE IN A MANNER WHICH RETAINS OPERATIONS OF NOT LESS THAN HALF OF THE DRIVEWAY AT ALL TIMES. FULL CLOSURE OF SUCH DRIVEWAY CAN BE CONSIDERED WITH WRITTEN AUTHORIZATION RETAINED BY THE CONTRACTOR FROM THE PROPERTY OWNER(S) OR ACCESS EASEMENT RIGHT HOLDER(S) OF THE DRIVEWAY ALLOWING FULL CLOSURE OF THE DRIVEWAY. 20. TREES MUST NOT OVERHANG WITHIN 10' VERTICALLY OF A SIDEWALK, OR 18' VERTICALLY OF A ROADWAY OR DRIVEWAY. WASTEWATER NOTES: 1. REFER TO THE CITY OF CEDAR PARK PUBLIC WORKS UTILITY POLICY AND SPECIFICATIONS MANUAL. 2. MANHOLE FRAMES AND COVERS AND WATER VALVE BOXES SHALL BE RAISED TO FINISHED PAVEMENT GRADE AT THE OWNER'S EXPENSE BY THE CONTRACTOR WITH THE CITY APPROVAL. ALL UTILITY ADJUSTMENTS SHALL BE COMPLETED PRIOR TO FINAL PAVING CONSTRUCTION. 3. THE LOCATION OF ANY EXISTING UTILITY LINES SHOWN ON THESE PLANS MAY NOT BE ACCURATE. ANY DAMAGE TO EXISTING UTILITY LINES, BOTH KNOWN AND UNKNOWN, SHALL BE REPAIRED AT THE EXPENSE OF THE CONTRACTOR. THE CONTRACTOR SHALL LOCATE ALL UTILITIES PRIOR TO BIDDING THE PROJECT. 4. ALL IRON PIPE AND FITTINGS SHALL BE WRAPPED WITH AT LEAST 8 MIL. POLYETHYLENE WRAP. 5. ALL WATER MAINS, WASTEWATER MAINS AND SERVICE LINES SHALL MEET CITY OF AUSTIN MINIMUM COVER SPECIFICATIONS. ALL STREETS ARE TO BE CUT TO SUBGRADE PRIOR TO INSTALLATION OF WATER MAINS OR CUTS WILL BE ISSUED BY THE ENGINEER. 6. WHERE 48-INCHES OF COVER BELOW SUBGRADE CANNOT BE ACHIEVED FOR WASTEWATER SERVICE LINES ALTERNATE MATERIALS MAY BE USED. A MINIMUM OF 36-INCHES OF COVER BELOW SUBGRADE SHALL BE ACHIEVED. ANY WASTEWATER SERVICE LINE WITH COVER BETWEEN 36-INCH AND 48- INCHES SHALL BE SDR-26 PVC PRESSURE PIPE. 7. GASKETED PVC SEWER MAIN FITTINGS SHALL BE USED TO CONNECT SDR-35 PVC TO SDR-26 PVC PRESSURE PIPE OR C-900. 8. PIPE MATERIALS TO BE USED FOR CONSTRUCTION OF UTILITY LINES: WASTEWATER- 4" SDR 35 - PVC SS FORCE MAIN- N/A (NOTE: IF USING PVC, SDR-26 IS REQUIRED, SDR-35 WW IS NOT ALLOWED. FORCEMAINS SHALL BE EPOXY LINED DUCTILE IRON) 9. ALL SANITARY SEWERS, EXCLUDING SERVICE LINES, SHALL BE MANDREL TESTED PER TCEQ (TEXAS COMMISSION ON ENVIRONMENTAL QUALITY) CRITERIA. A MANDREL TEST WILL NOT BE PERFORMED UNTIL BACKFILL HAS BEEN IN PLACE FOR A MINIMUM OF 30 DAYS. 10. ALL WASTEWATER LINES 10" AND LARGER SHALL BE VIDEO INSPECTED IN ACCORDANCE WITH CITY OF CEDAR PARK PUBLIC WORKS DEPARTMENT UTILITY POLICY AND STANDARD SPECIFICATIONS MANUAL APPENDIX E: REQUIREMENTS FOR VIDEO INSPECTION OF WASTEWATER LINES AT THE CONTRACTOR'S EXPENSE. NO SEPARATE PAY UNLESS NOTED ON THE BID FORM. 11. ALL SANITARY SEWERS, INCLUDING SERVICE LINES, SHALL BE AIR TESTED PER CITY OF AUSTIN STANDARD SPECIFICATIONS. 12.DENSITY TESTING OF COMPACTED BACKFILL SHALL BE MADE AT A RATE OF ONE TEST PER TWO FOOT LIFTS PER 500 FEET OF INSTALLED PIPE. 13. CITY SHALL BE GIVEN 48 HOURS NOTICE PRIOR TO ALL TESTING OF WATER AND WASTEWATER LINES. CITY INSPECTION IS REQUIRED FOR ALL TESTING OF WATER AND WASTEWATER LINES. 14. WHERE A WATER OR WASTEWATER LINE CROSSES ABOVE (OR BELOW) A STORM SEWER STRUCTURE AND THE BOTTOM (OR TOP) OF THE PIPE IS WITHIN 18 INCHES OF THE TOP (OR BOTTOM) OF THE UTILITY STRUCTURE, THE PIPE SHALL BE ENCASED WITH CONCRETE FOR A DISTANCE OF AT LEAST 1 FT. ON EITHER SIDE OF THE DITCH LINE OF THE UTILITY STRUCTURE OR THE STORM SEWER. CONCRETE ENCASEMENT WILL NOT BE REQUIRED FOR DUCTILE IRON (THICKNESS CLASS 50), AWWA C-900 (SDR- 18) 150 PSI RATED PVC IN SIZES TO 12 INCHES OR AWWA C-905 (SDR-25) 165 PSI RATED PVC IN SIZES LARGER THAN 12 INCHES. CONCRETE ENCASEMENT SHALL CONFORM TO C.O.A. STANDARD DETAIL 505-1. 15. THE ALLOWABLE (MAXIMUM) ADJUSTMENT FOR A MANHOLE SHALL BE 12” (INCHES) OR LESS. 16. WHERE A SEWER LINE CROSSES A WATER LINE, THE SEWER LINE SHALL BE ONE 20 FT. JOINT OF 150 PSI RATED PVC CENTERED ON CROSSING. 17. ALL MANHOLE AND INLET COVERS SHALL READ “CITY OF CEDAR PARK”. 18. CONTRACTOR TO NOTIFY, AND OBTAIN APPROVAL FROM, THE CITY OF CEDAR PARK 48 HOURS PRIOR TO CONNECTING TO EXISTING CITY UTILITIES. 19. ALL PIPE BEDDING MATERIAL SHALL CONFORM TO CITY OF AUSTIN STANDARD SPECIFICATIONS. 20.UNLESS OTHERWISE SPECIFIED BY THE ENGINEER ALL CONCRETE IS TO BE CLASS “A” (5 SACK, 3000 PSI ~ 28-DAYS), AND ALL REINFORCING STEEL TO BE ASTM A615 60. 21. ALL WASTEWATER MANHOLES TO BE COATED WITH ORGANIC MATERIALS AND PROCEDURES LISTED IN CITY OF AUSTIN QUALIFIED PRODUCTS LIST NO. WW-511 (WW-511A AND WW-511B ARE NOT ALLOWED UNLESS MANHOLE IS BEING STRUCTURALLY REHABILITATED WITH APPROVAL BY PUBLIC WORKS). ALL MANHOLES WILL BE PRE-COATED OR COATED AFTER TESTING. 22.POLYBRID COATINGS ON WASTEWATER MANHOLES WILL NOT BE ALLOWED. ANY OTHER PRODUCT APPEARING ON THE COA SPL WW-511 IS ACCEPTABLE. 23. ALL PENETRATIONS OF EXISTING WASTEWATER MANHOLES ARE REQUIRED TO BE RE-COATED IN ACCORDANCE WITH THE SPECIFICATIONS LISTED IN NOTE 20. 24. ALL MANHOLES WILL BE VACUUM TESTED ONLY. 25. TRACER TAPE AND MARKING TAPE SHALL BE INSTALLED ON ALL WATER AND WASTEWATER MAINS IN ACCORDANCE WITH CITY OF AUSTIN STANDARDS, REGARDLESS OF THE TYPE OF PIPE. 26. ALL PRESSURE PIPE SHALL HAVE MECHANICAL RESTRAINT AND CONCRETE THRUST BLOCKING AT ALL VALVES, BENDS, TEES, PLUGS, AND OTHER FITTINGS. WATER NOTES: 1. REFER TO THE CITY OF CEDAR PARK PUBLIC WORKS UTILITY POLICY AND SPECIFICATIONS MANUAL. 2. THE TOP OF VALVE STEMS SHALL BE AT LEAST 18”, AND NO MORE THAN 36”, BELOW FINISHED GRADE. VALVE STEM RISERS SHALL BE WELDED ON EACH END TO THE CITY'S SATISFACTION. 3. FIRE HYDRANT LEADS TO BE DUCTILE IRON, CLASS 350, AND INSTALLED PER CITY OF AUSTIN STANDARD SPECIFICATIONS AND DETAIL. 4. PRIOR TO INSTALLATION OF FIRE HYDRANTS, THE ENGINEER WILL PROVIDE THE CONTRACTOR ONE (1) CUT FROM A HUB PIN, ESTABLISHING THE ELEVATION OF THE BURY LINE. 5. THE ENGINEER SHALL PROVIDE CUTS FOR ALL WATER LINES AT ALL STORM SEWER CROSSINGS TO THE CITY OF CEDAR PARK. 6. PIPE MATERIALS TO BE USED FOR CONSTRUCTION OF UTILITY LINES: · WATER - NO CHANGES SCHEDULED FOR PUBLIC WATER LINE. COPPER PIPE AND FITTINGS ARE NOT PERMITTED WITHIN THE RIGHT-OF-WAY. MINIMUM DR-14 12” DIA AND SMALLER. MINIMUM CLASS 250 DI LARGER THAN 12” DIA. 7. APPROVED 5 1⁄4” FIRE HYDRANTS: § AMERICAN FLOW CONTROL, B84B § MUELLER COMPANY, SUPER CENTURION 250 § CLOW MEDALLION HYDRANT - REQUIREMENTS FOR PRIVATE FIRE HYDRANTS (BEHIND DOUBLE CHECK BACKFLOW PREVENTION ASSEMBLY): MUST BE IN ACCORDANCE WITH CITY OF AUSTIN SPECIFICATIONS. § ALL FIRE HYDRANTS MUST MEET CITY OF CEDAR PARK THREAD SPECIFICATIONS (NATIONAL THREAD) § BLUE REFLECTOR MARKERS SHALL BE LOCATED ON THE CENTERLINE OF THE PAVEMENT ACROSS FROM ALL FIRE HYDRANTS. PAVEMENT MARKERS AT INTERSECTIONS SHALL BE FOUR-SIDED. 8. SHOULD A TAPPING SADDLE BE APPROVED BY PUBLIC WORKS, THE SADDLE SHALL BE SMITH-BLAIR 662 STAINLESS STEEL TAPPING SLEEVES WITH ALL STAINLESS HARDWARE, OR APPROVED EQUAL. REQUESTS FOR ALTERNATE PROVIDERS SHALL BE MADE TO THE CITY OF CEDAR PARK PUBLIC WORKS. NO TAP EXCEEDING 2” IN DIAMETER WILL BE APPROVED. 9. ALL WATER LINES, INCLUDING SERVICE LINES, SHALL BE PRESSURE AND LEAK TESTED PER CITY OF AUSTIN STANDARD SPECIFICATIONS AND WITNESSED BY THE CITY OF CEDAR PARK REPRESENTATIVE. ALL TESTING IS TO BE THE RESPONSIBILITY OF THE CONTRACTOR, AND THE CONTRACTOR MAY BE REQUIRED TO RE-TEST LINES IF THE TESTING IS NOT WITNESSED BY THE CITY. CONTRACTOR MUST NOTIFY THE CITY OF CEDAR PARK 48 HOURS PRIOR TO ANY TESTING. INITIAL WATER LINE DISINFECTION MUST MEET A CHLORINE RESIDUAL OF 50PPM, AND A CHLORINE RESIDUAL OF 25 PPM AFTER A 24 HOUR DETENTION PERIOD. SECTIONS THAT ARE 20 - 30 FEET CAN USE GRANULAR OR TABLET DISINFECTION, BUT ANYTHING BEYOND THAT MUST BE LIQUID DISINFECTION TO EVENLY CLEAN THE PIPE. 10. ALL WATER LINES SHALL BE STERILIZED AND BACTERIOLOGICALLY TESTED IN ACCORDANCE WITH CITY OF AUSTIN STANDARDS. THE CONTRACTOR IS RESPONSIBLE FOR STERILIZATION AND THE CITY OF CEDAR PARK IS RESPONSIBLE FOR SUBMITTING BACTERIOLOGICAL SAMPLES TO THE STATE. PUBLIC WORKS WILL REQUIRE A CONTRACTOR SPECIALIZED IN DISINFECTION FOR LARGE DIAMETER LINES OR CRITICAL INFRASTRUCTURE, SUBSIDIARY TO PIPE INSTALLATION. 11.DENSITY TESTING OF COMPACTED BACKFILL SHALL BE MADE AT A RATE OF ONE TEST PER TWO FOOT LIFTS PER 500 FEET OF INSTALLED PIPE. 12. CONTRACTOR TO OBTAIN A WATER METER FROM THE CITY OF CEDAR PARK FOR ANY WATER THAT MAY BE REQUIRED DURING CONSTRUCTION. (512-401-5000) 13. ALL WATER METER BOXES SHALL BE FORD GULF METER BOX WITH LOCKING LID. • SINGLE G-148-233 • DUAL DG-148-243 • 1” METER YL111 - 444 • 1 1⁄2” - 2” METER 1730-R (LID) & 1730-12 (BOX)/ACCEPTABLE BOXES FOR THIS SIZE OF METER 14.MANHOLE FRAMES AND COVERS AND WATER VALVE BOXES SHALL BE RAISED TO FINISHED PAVEMENT GRADE, WHEN IN PUBLIC STREETS, AT THE OWNER'S EXPENSE BY THE CONTRACTOR WITH CITY INSPECTION. ALL UTILITY ADJUSTMENTS SHALL BE COMPLETED PRIOR TO FINAL PAVING CONSTRUCTION. 15. THE LOCATION OF ANY EXISTING UTILITY LINES SHOWN ON THESE PLANS IS THE BEST AVAILABLE AND MAY NOT BE ACCURATE. ANY DAMAGE TO EXISTING UTILITY LINES, BOTH KNOWN AND UNKNOWN, SHALL BE REPAIRED AT THE EXPENSE OF THE CONTRACTOR. 16. ALL IRON PIPE AND FITTINGS SHALL BE WRAPPED WITH AT LEAST 8 MIL. POLYETHYLENE WRAP. 17. ALL WATER MAINS, WASTEWATER MAINS AND SERVICE LINES SHALL MEET CITY OF AUSTIN SPECIFICATIONS FOR MINIMUM COVER REQUIREMENTS. ALL STREETS ARE TO BE CUT TO SUBGRADE PRIOR TO INSTALLATION OF WATER MAINS OR CUTS WILL BE ISSUED BY THE ENGINEER. 18. CITY TO BE GIVEN 48 HOURS NOTICE PRIOR TO ALL TESTING OF WATER AND WASTEWATER LINES. CITY INSPECTION IS REQUIRED FOR ALL TESTING OF WATER AND WASTEWATER LINES. 19. WHERE A WATER OR WASTEWATER LINE CROSSES ABOVE (OR BELOW) A STORM SEWER STRUCTURE AND THE BOTTOM (OR TOP) OF THE PIPE IS WITHIN 18 INCHES OF THE TOP (OR BOTTOM) OF THE UTILITY STRUCTURE, THE PIPE SHALL BE ENCASED WITH CONCRETE FOR A DISTANCE OF AT LEAST 1 FT. ON EITHER SIDE OF THE DITCH LINE OF THE UTILITY STRUCTURE OR THE STORM SEWER. CONCRETE ENCASEMENT WILL NOT BE REQUIRED FOR DUCTILE IRON (THICKNESS CLASS 50), AWWA C-900 (SDR- 18) 150 PSI RATED PVC IN SIZES TO 12 INCHES OR AWWA C-905 (SDR-25) 165 PSI RATED PVC IN SIZES LARGER THAN 12 INCHES. CONCRETE ENCASEMENT SHALL CONFORM TO C.O.A. STANDARD DETAIL 505-1. 20.CONTRACTOR TO NOTIFY THE CITY OF CEDAR PARK 48 HOURS PRIOR TO CONNECTING TO EXISTING UTILITIES. 21. ALL PIPE BEDDING MATERIAL SHALL CONFORM TO CITY OF AUSTIN STANDARD SPECIFICATIONS. 22. TRACER TAPE SHALL BE INSTALLED ON ALL WATER AND WASTEWATER MAINS REGARDLESS OF THE TYPE OF PIPE OR DEPTH OF PIPE INSTALLED. 23.UNLESS OTHERWISE SPECIFIED BY THE ENGINEER ALL CONCRETE IS TO BE CLASS “A” (5 SACK, 3000 PSI ~ 28-DAYS), AND ALL REINFORCING STEEL TO BE ASTM A615 60. 24. THE CITY CONSIDERS PROTECTION OF ITS WATER SYSTEM PARAMOUNT TO CONSTRUCTION ACTIVITIES. CITY PERSONNEL WILL OPERATE, OR AUTHORIZE THE CONTRACTOR TO OPERATE, ALL WATER VALVES THAT WILL PASS THROUGH THE CITY'S POTABLE WATER. THE CONTRACTOR MAY NOT OPERATE ANY WATER VALVE, EXISTING OR PROPOSED, THAT WILL ALLOW WATER FROM THE CITY'S WATER SYSTEM TO FLOW TO A PROPOSED OR EXISTING WATER SYSTEM WITHOUT THE EXPRESS CONSENT OF THE CITY. NOTIFY THE CITY TWO BUSINESS DAYS IN ADVANCE OF ANY REQUEST TO OPERATE A WATER VALVE. THE GENERAL CONTRACTOR MAY BE FINED $500 OR MORE, INCLUDING ADDITIONAL THEFT OF WATER FINES, IF A WATER VALVE IS OPERATED IN AN UNAUTHORIZED MANNER, REGARDLESS OF WHO OPERATED THE VALVE. 25. ALL WATER VALVES OVER 24" IN SIZE SHALL HAVE A BY-PASS LINE AND VALVE INSTALLED. BY-PASS VALVES AND LINES ARE SUBSIDIARY TO THE COST OF THE VALVE UNLESS SPECIFICALLY IDENTIFIED ON THE BID FORM. 26. ALL WATER VALVES, INCLUDING THOSE OVER 12" IN SIZE, SHALL BE GATE VALVES. 27. A DOUBLE CHECK BACKFLOW DEVICE IN A VAULT SHALL BE INSTALLED AT THE PROPERTY LINE ON ALL PRIVATE FIRE LINES. A DETECTOR WATER METER WILL BE INSTALLED ON THIS BACKFLOW DEVICE, AND IT MUST BE A SENSUS SRII 3/4" METER WITH AMI RADIO READ CAPABILITY. THE CITY WILL PROVIDE THIS METER. PLEASE REFERENCE THE CITY OF CEDAR PARK DOUBLE CHECK BACKFLOW PREVENTION ASSEMBLY DETAIL. 28. ALL POTABLE WATER SYSTEM COMPONENTS INSTALLED AFTER JANUARY 4, 2014, SHALL BE “LEAD FREE” ACCORDING TO THE UNITED STATES SAFE DRINKING WATER ACT. THE ONLY COMPONENTS EXEMPT FROM THIS REQUIREMENT ARE FIRE HYDRANTS. COMPONENTS THAT ARE NOT CLEARLY IDENTIFIED BY THE MANUFACTURER AS MEETING THIS REQUIREMENT BY MARKING, OR ON THE PRODUCT PACKAGING, OR BY PRE-APPROVED SUBMITTAL, WILL BE REJECTED FOR USE. A NSF CERTIFICATION WILL BE ADEQUATE IF THE CERTIFICATION HAS NOT EXPIRED AS OF JANUARY 4, 2014 AND REMAINS UNEXPIRED AT THE TIME OF CONSTRUCTION. 29. ALL PRESSURE PIPE SHALL HAVE MECHANICAL RESTRAINT AND CONCRETE THRUST BLOCKING AT ALL VALVES, BENDS, TEES, PLUGS, AND OTHER FITTINGS. STORM SEWER NOTES: 1. MANHOLE FRAMES AND COVERS AND WATER VALVE BOXES SHALL BE RAISED TO FINISHED PAVEMENT GRADE AT THE OWNER'S EXPENSE BY THE CONTRACTOR WITH CITY INSPECTION. ALL UTILITY ADJUSTMENTS SHALL BE COMPLETED PRIOR TO FINAL PAVING CONSTRUCTION. CONTRACTOR SHALL BACKFILL AROUND MANHOLES AND JUNCTION BOXES WITH CLASS A CONCRETE. 2. ALL MANHOLE LIDS SHALL BE 32” OR LARGER, UNLESS EXPRESSLY APPROVED IN WRITING BY THE ENGINEERING DEPARTMENT. 3. THE LOCATION OF ANY EXISTING UTILITY LINES SHOWN ON THESE PLANS IS THE BEST AVAILABLE AND MAY NOT BE ACCURATE. ANY DAMAGE TO EXISTING UTILITY LINES, BOTH KNOWN AND UNKNOWN, SHALL BE REPAIRED AT THE EXPENSE OF THE CONTRACTOR. 4. PIPE MATERIALS TO BE USED FOR CONSTRUCTION OF UTILITY LINES: UNLESS OTHERWISE SPECIFIED BY THE ENGINEER, ALL STORM SEWER RCP SHALL BE CLASS III. CORRUGATED METAL PIPE IS NOT PERMITTED. 5. ALL MANHOLE AND INLET COVERS SHALL READ “CITY OF CEDAR PARK”. 6. CONTRACTOR TO NOTIFY THE CITY OF CEDAR PARK 48 HOURS PRIOR TO CONNECTING TO EXISTING UTILITIES. 7. ALL PIPE BEDDING MATERIAL SHALL CONFORM TO CITY OF AUSTIN STANDARD SPECIFICATIONS. 8. UNLESS OTHERWISE SPECIFIED BY THE ENGINEER ALL CONCRETE IS TO BE CLASS “A” (5 SACK, 3000 PSI ~ 28-DAYS), AND ALL REINFORCING STEEL TO BE ASTM A615 60. 9. CONTRACTOR TO INSTALL AND MAINTAIN GEO-TEXTILE FABRIC BARRIER (INLET PROTECTION) AROUND STORM SEWER LEADS AND INLETS TO PREVENT SILT AND OTHER MATERIAL FROM ENTERING THE STORM SEWER COLLECTION SYSTEM. 10.INSTALL CONCRETE SAFETY END TREATMENTS TO ALL CULVERTS AND ENDS OF DRAINAGE PIPE. 11. ALL CURB INLETS SHALL HAVE AN ALMETEK 4” DISC “NO DUMPING DRAINS TO WATERWAY” MARKER. SEQUENCE OF CONSTRUCTION NOTES: THE FOLLOWING SEQUENCE OF CONSTRUCTION SHALL BE USED FOR ALL DEVELOPMENT. THE APPLICANT IS ENCOURAGED TO PROVIDE ANY ADDITIONAL DETAILS APPROPRIATE FOR THE PARTICULAR DEVELOPMENT. 1. TEMPORARY EROSION AND SEDIMENTATION CONTROLS ARE TO BE INSTALLED AS INDICATED ON THE APPROVED SITE PLAN OR SUBDIVISION CONSTRUCTION PLAN AND IN ACCORDANCE WITH THE EROSION SEDIMENTATION CONTROL PLAN (ESC) AND STORMWATER POLLUTION PREVENTION PLAN (SWPPP) THAT IS REQUIRED TO BE POSTED ON THE SITE. INSTALL TREE PROTECTION AND INITIATE TREE MITIGATION MEASURES. 2. THE GENERAL CONTRACTOR MUST CONTACT THE CITY INSPECTOR AT 512-401-5000, 72 HOURS PRIOR TO THE SCHEDULED DATE OF THE REQUIRED ON-SITE PRECONSTRUCTION MEETING. 3. THE GENERAL CONTRACTOR WILL FOLLOW THE EROSION SEDIMENTATION CONTROL PLAN (ESC) AND STORM WATER POLLUTION PREVENTION PLAN (SWPPP) POSTED ON THE SITE. TEMPORARY EROSION AND SEDIMENTATION CONTROLS WILL BE REVISED, IF NEEDED, TO COMPLY WITH CITY INSPECTORS' DIRECTIVES, AND REVISED CONSTRUCTION SCHEDULE RELATIVE TO THE WATER QUALITY PLAN REQUIREMENTS AND THE EROSION PLAN. 4. ROUGH GRADE THE POND(S) AT 100% PROPOSED CAPACITY. EITHER THE PERMANENT OUTLET STRUCTURE OR A TEMPORARY OUTLET MUST BE CONSTRUCTED PRIOR TO DEVELOPMENT OF EMBANKMENT OR EXCAVATION THAT LEADS TO PONDING CONDITIONS. THE OUTLET SYSTEM MUST CONSIST OF A SUMP PIT OUTLET AND AN EMERGENCY SPILLWAY MEETING THE REQUIREMENTS OF THE CITY OF AUSTIN DRAINAGE CRITERIA MANUAL, AS REQUIRED. THE OUTLET SYSTEM SHALL BE PROTECTED FROM EROSION AND SHALL BE MAINTAINED THROUGHOUT THE COURSE OF CONSTRUCTION UNTIL INSTALLATION OF THE PERMANENT WATER QUALITY POND(S). 5. TEMPORARY EROSION AND SEDIMENTATION CONTROLS WILL BE INSPECTED AND MAINTAINED IN ACCORDANCE WITH THE EROSION SEDIMENTATION CONTROL PLAN (ESC) AND STORM WATER POLLUTION PREVENTION PLAN (SWPPP) POSTED ON THE SITE. 6. BEGIN SITE CLEARING/CONSTRUCTION (OR DEMOLITION) ACTIVITIES. 7. UNDERGROUND UTILITIES WILL BE INSTALLED, INCLUDING FIRE HYDRANTS. 8. FIRE DEPARTMENT ACCESS WILL BE INSTALLED WHERE REQUIRED BY APPROVED SITE PLAN. 9. VERTICAL CONSTRUCTION MAY OCCUR AFTER THE PRE-VERTICAL INSPECTION HAS BEEN CLEARED BY THE FIRE MARSHAL. 10.PERMANENT WATER QUALITY PONDS OR CONTROLS WILL BE CLEANED OUT AND FILTER MEDIA WILL BE INSTALLED PRIOR TO/CONCURRENTLY WITH REVEGETATION OF SITE. 11. COMPLETE CONSTRUCTION AND START REVEGETATION OF THE SITE AND INSTALLATION OF LANDSCAPING. 12.UPON COMPLETION OF THE SITE CONSTRUCTION AND REVEGETATION OF A PROJECT SITE, THE DESIGN ENGINEER SHALL SUBMIT AN ENGINEER'S LETTER OF CONCURRENCE BEARING THE ENGINEER'S SEAL, SIGNATURE, AND DATE TO THE CITY INDICATING THAT CONSTRUCTION, INCLUDING REVEGETATION, IS COMPLETE AND IN SUBSTANTIAL COMPLIANCE WITH THE APPROVED PLANS. AFTER RECEIVING THIS LETTER, A FINAL INSPECTION WILL BE SCHEDULED BY THE CITY INSPECTOR. 13.UPON COMPLETION OF LANDSCAPE INSTALLATION OF A PROJECT SITE, THE LANDSCAPE ARCHITECT SHALL SUBMIT A LETTER OF CONCURRENCE TO THE CITY INDICATING THAT THE REQUIRED LANDSCAPING IS COMPLETE AND IN SUBSTANTIAL CONFORMITY WITH THE APPROVED PLANS. AFTER RECEIVING THIS LETTER, A FINAL INSPECTION WILL BE SCHEDULED BY THE CITY INSPECTOR. 14. AFTER A FINAL INSPECTION HAS BEEN CONDUCTED BY THE CITY INSPECTOR AND WITH APPROVAL FROM THE CITY INSPECTOR, REMOVE THE TEMPORARY EROSION AND SEDIMENTATION CONTROLS AND COMPLETE ANY NECESSARY FINAL REVEGETATION RESULTING FROM REMOVAL OF THE CONTROLS. CONDUCT ANY MAINTENANCE AND REHABILITATION OF THE WATER QUALITY PONDS OR CONTROLS. N 1" NORTH ARROW/SCALE BAR NOTE: STAR ON NORTH ARROW IS EXACTLY 1 INCH WIDE IN ALL DIRECTIONS FROM STAR-POINT TO STAR-POINT. TE:AS COMMISSION ON ENVIRONMENTAL 37ALIT; CONTRIB7TING CIVIL ENGINEERING AND PLANNING (972) 822 - 1682 TBPE FIRM REGISTRATION NO. F-22664 OF NO. REVISIONS ENGINEERED BY APPROVAL DATE DESCRIPTION 1. 2. 3. 4. 5. 6. DATE 11/08/2024 PROJECT NO. 2024-21-SD DESIGNED BY DWL CHECKED BY AHG 24 104 W WHITESTONE BLVD FINAL PLAT 03 2024-21-SD APPROVED December 18, 2024 City of Cedar Park Development Services Department

Related document

x
Report download errors
Report content



Download file quality is faulty:
Full name:
Email:
Comment
If you encounter an error, problem, .. or have any questions during the download process, please leave a comment below. Thank you.