PDF Google Drive Downloader v1.1


Report a problem

Content text 16.MS-POP Work 1-3-17.pdf

ASHIANA HOUSING LIMITED METHOD STATEMENT FOR POP WORK INTRODUCTION This method statement describes the activities to carry out POP works as per specifications. OBJECT Following documents shall be considered as reference for execution of the job: • GFC Drawings MATERIAL POP, water APPARATUS/EQUIPMENT: Fiber Blade/Gurmala, Buckets, Masks, Ladder, polythene sheets, stool, MS challi, Al Fanti HEALTH AND SAFETY PROVISION:  Workers shall be provided with complete PPE.  All workers shall be provided with proper tools & equipment to execute the work safely. PREPARATORY WORK:  Plaster repairing work shall be completed before start of POP work.  Dado tile work shall be completed before start of POP work.  Proper working platform and lighting arrangement shall be provided.  POP shall be thoroughly stirred to a uniform consistency:

Related document

x
Report download errors
Report content



Download file quality is faulty:
Full name:
Email:
Comment
If you encounter an error, problem, .. or have any questions during the download process, please leave a comment below. Thank you.