PDF Google Drive Downloader v1.1


Report a problem

Content text GANDHINAGAR_R&B_SOR_2021-22.pdf

FOR OFFICE USE ONLY GANDHINAGAR GANDHINAGAR DISTRICT GOVERNMENT OF GUJARAT SCHEDULE OF RATES BUILDINGS, ROADS & BRIDGES WORKS OF YEAR : 2021-22 FOR CAPITAL PROJECT CIRCLE ROADS & BUILDINGS DEPARTMENT OFFICE OF THE EXECUTIVE ENGINEER CAPITAL PROJECT DIVISION No. - 4 GANDHINAGAR
Sr. No. Page No. 1 4 2 5 3 6 4 7 Chapter No. Page No. 1 A BASIC RATES OF MATERIALS 10 B BASIC RATES OF LABOUR 51 C BASIC RATES OF CARRIAGE 53 D BASIC RATES OF HIRE CHARGES 55 E BASIC RATES OF EXTRA RATES 57 2 59 A EARTHWORK (EXECUTED WITH MECHANISED EFFORTS/ MACHINARIES) 60 B EARTHWORK (EXECUTED WITH MANUAL LABOUR) 63 SOR 2021-22 GANDHINAGAR STATEMENT – 4B CARRIAGE OF MATERIALS- FOR MATERIALS OTHER THAN ASHPHALT, CEMENT AND STEEL) STATEMENT - 5 (CONVEYANCE CHARGES-FOR DIFFERENT TYPES OF MATERIALS) Chapter Name BASIC RATES INPUTS MORTAR 4 INDEX ANNEXURES STATEMENT - 1 (BASIC RATES FOR QUARRY MATERIALS) STATEMENT - 4A (CARRIAGE OF MATERIALS- FOR ASHPHALT,CEMENT AND STEEL) Gandhinagar SOR 2021-22
Chapter No. Page No. Chapter Name 5 65 6 81 7 87 9 89 10 93 11 110 12 115 13 117 14 118 15 127 16 129 17 131 18 135 19 139 20 144 21 153 22 154 23 158 24 167 A ROAD WORKS AND CULVERTS (EXECUTED WITH MECHANISED EFFORTS / MACHINARIES) 174 B ROAD WORK AND CULVERTS (EXECUTED WITH MANUAL LABOUR) 236 27 239 * 261 26 BUILDING HARDWARE GLAZING PAVING & FLOOR FINISHES ROOF COVERINGS CEILING & LINING STANDARDS FOR CEMENT CONSUMPTION WHITE WASHING, COLOUR WASHING, DISTEMPERING & OTHER FINISHING PAINTING & POLISHING DEMOLITION & DISMANTLING REPAIRS TO BUILDINGS MISCELLENEOUS BUILDING ITEMS WATER SUPPLY, PLUMBING & SANITARY FITTINGS DRAINAGE & SEWERAGE ITEMS STONE MASONARY FORM WORK WOOD WORK & JOINERY STEEL, ALLUMINUM & IRON WORK PLASTERING & POINTING BRIDGE WORK CONCRETE WORK BRICK WORK Gandhinagar SOR 2021-22
Sr. No. Description Unit Rate in Rs. (2021-22) 1 Fine Sand Cu.M. 179.00 2 Coarse Sand Cu.M. 196.00 3 Hand Broken Aggregate (1) 90mm to 25mm size Cu.M. 173.00 (2) 63mm to 40mm size Cu.M. 203.00 4 Crushed Stone Aggregate For Hard Quality (1) 40mm to 63mm size Cu.M. 293.00 (2) 40mm size Cu.M. 319.00 (3) 20mm size Cu.M. 413.00 (4) 10mm size Cu.M. 390.00 (5)10mm to 20mm size Cu.M. 330.00 (6) 6mm to 10mm size Cu.M. 274.00 5 Brick Aggregate (1) 40mm size Cu.M. 153.00 (2) 20mm size Cu.M. 153.00 6 Brick (1) Conventional size 1000 Nos 3570.00 (2) Modular size 20 cm x 10 cm x 10 cm 1000 Nos 3740.00 7 Rubble Cu.M. 148.00 8 Rubble heavy (weight not less than 40 kg) Cu.M. 156.00 9 Quarry spalls Cu.M. 84.00 10 White Bela Stone (size 23cm measured) 1000 Nos 2805.00 11 Screened Rounded Gravel (1) 10mm size Cu.M. 168.00 (2) 20mm size Cu.M. 168.00 12 Murrum/Blnding Material Cu.M. 64.00 13 Unscreened Gravel Cu.M. 126.00 14 Hard Murrum Cu.M. 96.00 15 Stone Dust Cu.M. 105.00 16 Flyash bricks conventional 1000 Nos 4250.00 QUARRY BASED MATERIALS' RATE STATEMENT NO.1 Gandhinagar SOR 2021-22 4
COST OF DIESEL Rs.88PER LITRE. (Col.6 X 88) Litre OF OIL CONSU MED 1 lit per 140 km COST OF OIL AT Rs.270 PER LITRE (Col 8 X 270.00) COST OF SIX MAZDOOR (MALE) EACH Rs.332.00 PER/DAY = 6x332 HIRE CHARGE OF TRUCK Rs.3650 PER/DAY 88.00 140 270.00 1992.00 3650.00 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1 0.50 15.00 2.61 8.61 1.72 151.54 0.06 16.61 1992.00 3650.00 5810.15 2227.22 0.00 2104.16 5.85 2 1.00 16.00 2.56 11.12 2.22 195.71 0.08 21.45 1992.00 3650.00 5859.16 2288.73 61.51 2158.21 6.05 3 1.50 16.50 2.51 13.54 2.71 238.30 0.10 26.11 1992.00 3650.00 5906.41 2349.14 60.41 2211.21 6.24 4 2.00 17.00 2.47 15.89 3.18 279.66 0.11 30.65 1992.00 3650.00 5952.31 2407.18 58.04 2261.96 6.42 5 2.50 17.25 2.43 18.16 3.63 319.62 0.13 35.02 1992.00 3650.00 5996.64 2466.01 58.83 2312.87 6.62 6 3.00 17.50 2.39 20.36 4.07 358.34 0.15 39.27 1992.00 3650.00 6039.61 2523.69 57.68 2363.88 6.76 7 3.50 17.75 2.36 22.50 4.50 396.00 0.16 43.39 1992.00 3650.00 6081.39 2580.31 56.62 2412.50 6.96 8 4.00 18.00 2.32 24.58 4.92 432.61 0.18 47.40 1992.00 3650.00 6122.01 2635.87 55.56 2461.70 7.08 9 4.50 18.25 2.29 26.61 5.32 468.34 0.19 51.32 1992.00 3650.00 6161.66 2690.45 54.58 2508.28 7.26 10 5.00 18.50 2.26 28.60 5.72 503.36 0.20 55.16 1992.00 3650.00 6200.52 2744.15 53.70 2555.81 7.37 11 6.00 19.00 12.67 158.00 31.60 2780.80 1.13 304.71 1992.00 3650.00 8727.51 689.01 602.00 14.45 12 7.00 20.00 11.43 166.00 33.20 2921.60 1.19 320.14 1992.00 3650.00 8883.74 777.33 88.32 677.23 14.78 13 8.00 21.00 10.50 174.00 34.80 3062.40 1.24 335.57 1992.00 3650.00 9039.97 860.95 83.62 748.01 15.10 14 9.00 22.00 9.78 182.00 36.40 3203.20 1.30 351.00 1992.00 3650.00 9196.20 940.52 79.57 814.96 15.41 15 10.00 23.00 9.20 190.00 38.00 3344.00 1.36 366.43 1992.00 3650.00 9352.43 1016.57 76.05 81.89 878.58 15.71 16 15.00 27.00 7.20 222.00 44.40 3907.20 1.59 428.14 1992.00 3650.00 9977.34 1385.74 369.17 73.83 1186.18 16.82 17 25.00 33.00 5.28 270.00 54.00 4752.00 1.93 520.71 1992.00 3650.00 10914.71 2067.18 681.44 68.14 1747.52 18.29 18 50.00 40.00 3.20 326.00 65.20 5737.60 2.33 628.71 1992.00 3650.00 12008.31 3752.60 1685.42 67.42 3133.65 19.75 19 100.00 40.00 1.60 326.00 65.20 5737.60 2.33 628.71 1992.00 3650.00 12008.31 7505.19 3752.59 75.05 6267.31 19.75 20 200.00 45.00 0.90 366.00 73.20 6441.60 2.61 705.86 1992.00 3650.00 12789.46 14210.51 6705.32 67.05 11777.41 20.66 21 400.00 50.00 0.50 406.00 81.20 7145.60 2.90 783.00 1992.00 3650.00 13570.60 27141.20 12930.69 64.65 22343.32 21.47 22 400.00 53.00 0.35 430.00 86.00 7568.00 3.07 829.29 1992.00 3650.00 14039.29 39733.84 12592.64 62.96 21726.13 ABOVE 2021-22 STATEMENT No : 4 A ( 25 M.Ton Truck) Carrige of material over distance exceeding 0.5 Km. Including loading,unloading and stacking (for asphalt,cement & steel ) SR. NO. LEAD IN Km. % change of cost per trip w.r.t. 2015-16 COST PER TRIP 2015-16 COST PER TRIP for 2021-22 INCREASE IN COST OVER PREVIOUS K.M AVG.S PEED Km./h NO.OF TRIPS N=8/(2 L/S+3) Km. DONE =2NL+6 Litre OF DIESEL CONSU MED Av.5 km/lit TOTAL COST OF (7+ 9+ 10+ 11) GANDHINAGAR SOR 2021-22 5

Related document

x
Report download errors
Report content



Download file quality is faulty:
Full name:
Email:
Comment
If you encounter an error, problem, .. or have any questions during the download process, please leave a comment below. Thank you.