Content text (Elect4) System kerja kontrol drainage water pump area jetty.pdf

Document No. MMP001-415-PR-PHI-2000 Page 1 of 25 EPC OF JETTY MMP NICKEL SMELTER PROJECT MMP001-415-PR-PHI-2000 SYSTEM PHILOSOPHY FOR INSTRUMENTATION AND CONTROL SYSTEM Rev. No : C Page : 1/16 PROJECT NAME : MMP NICKEL SMELTER COMPANY : PT MITRA MURNI PERKASA CONTRACTOR : PT PP (Persero) Tbk PROJECT LOCATION : TELUK WARU, BALIKPAPAN - KALIMANTAN TIMUR CONTRACT NO. : 072/LGL/MMP-PP/XI/2022 C 11-09-23 Issued for Approval MT JA DU B 19-08-23 Issued for Approval MT JA DU A 09-04-23 Issued for Review MT JA DU Rev. Date Description PT PP PT PP PT PP Prepare Checked Approved Consultant : This document embodies proprietary information of PT.MITRA MURNI PERKASA this document or the material described thereon may not be copied or disclosed in any form or medium to third parties or used for other than the purpose for which it has been provided, in whole or in part in any manner except as expressly permitted by PT.MITRA MURNI PERKASA. [Gati, 12-Sep-2023] The MMP-ICS team has reviewed this revision C and agree to release this document with status of C1 for the purpose of PLC logic development and fire alarm control panel (FACP) programming. When the PLC logic development and FACP programming have been completed, this instrumentation and control system philosophy (MMP001-415-PR-PHI-2000) needs to be revised to match it with the final PLC logic and FACP program. The MMP-ICS team review here covers only the control system aspects. As this document has also process and safety aspects, it will also requires a review and sign off from the MMP process engineers and safety representatives.
Document No. MMP001-415-PR-PHI-2000 Page 2 of 25 EPC OF JETTY MMP NICKEL SMELTER PROJECT MMP001-415-PR-PHI-2000 SYSTEM PHILOSOPHY FOR INSTRUMENTATION AND CONTROL SYSTEM Rev. No : C Page : 2/16 REVISION SHEET DESCRIPTION NO PAGE SUBJECT DESCRIPTION OF CHANGE 1 7-8 Revise Jetty Instrumentation and Control system Philosophy Revise Jetty Instrumentation and Control System Philosophy based on last discussion 2 4-11 Revise Drainage Water Handling Revise Drainage Water Handling based on last discussion 3 11 Revise Sparge Water Handling Revise Sparge Water Handling based on last discussion 4 11-12 Revise Diesel Oil Handling Revise Diesel Oil Handling based on last discussion 5 13-14 Revise Fire Alarm Suppression System Revise Fire Alarm and Suppression System based on last discussion 6 14-16 Add Interlock List Add Interlock List with description
Document No. MMP001-415-PR-PHI-2000 Page 3 of 25 EPC OF JETTY MMP NICKEL SMELTER PROJECT MMP001-415-PR-PHI-2000 SYSTEM PHILOSOPHY FOR INSTRUMENTATION AND CONTROL SYSTEM Rev. No : C Page : 3/16 Content 1. INTRODUCTION.................................................................................................................5 1.1 Project Definitions.......................................................................................................5 1.2 Project Location...........................................................................................................5 1.3 Scope of Work.............................................................................................................5 1.4 Objectives.....................................................................................................................6 2. JETTY INSTRUMENTATION AND CONTROL SYSTEM PHILOSOPHY.................7 3. JETTY MATERIAL UNLOADING OPERATION............................................................8 3.1 Nickel Material Unloading Operation ........................................................................9 3.2 Reductant Coal Material Unloading Operation........................................................9 3.3 Coal for Gasification Material Unloading Operation................................................9 3.4 Silica Material Unloading Operation..........................................................................9 3.5 Sulfur Material Unloading Operation........................................................................9 4. DRAINAGE WATER HANDLING.....................................................................................9 5. SPARGE WATER HANDLING ....................................................................................... 11 6. DIESEL OIL HANDLING ................................................................................................ 12 7. FIRE ALARM AND SUPPRESSION SYSTEM............................................................ 13 8. INTERLOCK LIST............................................................................................................. 14
Document No. MMP001-415-PR-PHI-2000 Page 4 of 25 EPC OF JETTY MMP NICKEL SMELTER PROJECT MMP001-415-PR-PHI-2000 SYSTEM PHILOSOPHY FOR INSTRUMENTATION AND CONTROL SYSTEM Rev. No : C Page : 4/16 LIST OF FIGURES Figure 1. Project Location...............................................................................................................5 Figure 2. Jetty General Layout .......................................................................................................6

Related document

x
Report download errors
Report content



Download file quality is faulty:
Full name:
Email:
Comment
If you encounter an error, problem, .. or have any questions during the download process, please leave a comment below. Thank you.