Content text 2. EIA Consultant Team Leader Declaration.pdf
EIA CONSULTANT TEAM LEADER DECLARATION ENVIRONMENTAL IMPACT ASSESSMENT (SECOND SCHEDULE) FOR PROPOSED PROJECT OF LOGGING AND TIN MINING OPERATIONS, COMPARTMENTS 24 AND 31 WITHIN HUTAN SIMPAN KENDERONG MEASURING 245 HECTARES, SUB DISTRICT OF KERUNAI, DISTRICT OF HULU PERAK, PERAK DARUL RIDZUAN BY PULTEX ENVIRONMENT SDN. BHD. “I declare that the entire EIA Report is the product of my own work and the work of my team members (i.e other consultants who are also Qualified Persons) who work under my supervision and all the facts stated in the Report and the accompanying information are to be the best of my knowledge and belief true and correct and that I have not withheld or distorted any material facts. I have briefed the Project Proponent on the content of the Report and highlighted to him all the pollution prevention and mitigation measures (P2M2s) as described in it, and in the Environmental Management Plan (EMP) and in the LD-P2M2*, and the Project proponent has agreed to implement them (i.e P2M2)”. Name of EIA Consultant Team Leader : Dato’ Prof. Ir. Mohd Omar Ab. Kadir NRIC Number : 540516-02-5805 Designation : Director of Pultex Environment Sdn. Bhd. (Water Quality, Noise and Vibration) Signature : ........................... Date : 29 November 2021